Section 327IAC15-13-13. Storm water quality management plan public participation and involvement MCM  


Latest version.
  •    (a) The MS4 operator shall develop an SWQMP that includes provisions to allow opportunities for constituents within the MS4 area to participate in the storm water management program development and implementation. An MS4 operator shall ensure, via documented efforts, that sufficient opportunities were allotted to involve all constituents interested in participating in the program process to meet this measure. Correctional facilities will not be required to implement the public participation and involvement MCM.

      (b) An MS4 entity shall comply with applicable public notice requirements. An MS4 operator shall identify and implement a public participation and involvement program. A certification form shall be completed and submitted to the department once the program has been developed and implemented or three hundred sixty-five (365) days from the date the initial NOI letter submittal was received by the department, whichever is earlier. In subsequent permit terms, the certification form does not need to be completed and submitted. At a minimum, every five (5) years the program shall be reviewed for adequacy and accuracy and updated as necessary.

      (c) An MS4 operator shall develop measurable goals for this MCM. An initial assessment of MS4 area constituents must be conducted to identify interested individuals for participation in the MS4 area storm water program. To comply with this measure, specific outreach and reduction goal percentages and timetables must be identified. As applicable or, if not applicable, then appropriately justified, goals must address relevant community participation in citizen panels, community clean-ups, citizen watch groups and drain marking projects, and public meeting notification.

      (d) In combined sewer system municipalities designated under this rule, the current LTCP shall be reviewed, and any necessary language changes to ensure consistency with the SWQMP shall be included in the plan to ensure that this MCM requirement is met. (Water Pollution Control Division; 327 IAC 15-13-13; filed Jul 7, 2003, 2:15 p.m.: 26 IR 3588)