Rule 327IAC15-13. Storm Water Run-Off Associated with Municipal Separate Storm Sewer System Conveyances  


Section 327IAC15-13-1. Purpose
Section 327IAC15-13-2. Applicability
Section 327IAC15-13-3. MS4 area designation criteria
Section 327IAC15-13-4. General permit boundary
Section 327IAC15-13-5. Definitions
Section 327IAC15-13-6. Notice of intent letter requirements
Section 327IAC15-13-7. SWQMP-Part B: baseline characterization and report
Section 327IAC15-13-8. Submittal of an SWQMP-Part C: program implementation
Section 327IAC15-13-9. Submittal of an NOI letter and other documents
Section 327IAC15-13-10. MS4 permit implementation; coordination with total maximum daily load allocations
Section 327IAC15-13-11. Compliance schedule
Section 327IAC15-13-12. Storm water quality management plan public education and outreach MCM
Section 327IAC15-13-13. Storm water quality management plan public participation and involvement MCM
Section 327IAC15-13-14. Storm water quality management plan illicit discharge detection and elimination MCM
Section 327IAC15-13-15. Storm water quality management plan construction site storm water run-off control MCM
Section 327IAC15-13-16. Storm water quality management plan postconstruction storm water run-off control MCM
Section 327IAC15-13-17. Storm water quality management plan municipal operations pollution prevention and good housekeeping MCM
Section 327IAC15-13-18. Reporting requirements
Section 327IAC15-13-19. Permit duration
Section 327IAC15-13-20. Permit termination
Section 327IAC15-13-21. Standard conditions
Section 327IAC15-13-22. Inspection and enforcement