Section 327IAC15-13-10. MS4 permit implementation; coordination with total maximum daily load allocations  


Latest version.
  •    If a total maximum daily load (TMDL) is approved for any waterbody into which an MS4 conveyance discharges, the MS4 operator must review and appropriately modify Parts B and C of their SWQMP if the TMDL includes requirements for control of storm water discharges under the jurisdiction of the MS4 operator. (Water Pollution Control Division; 327 IAC 15-13-10; filed Jul 7, 2003, 2:15 p.m.: 26 IR 3587)