Section 327IAC5-21-4. Effect of permit issuance  


Latest version.
  •    An IWP permit holder shall comply with the requirements of the following:

    (1) The IWP permit as issued or modified.

    (2) The POTW receiving the permitted industrial discharge.

    (3) The local government having jurisdiction over the industrial discharge or the construction or operation of the discharging facility.

    (Water Pollution Control Division; 327 IAC 5-21-4; filed Oct 10, 2000, 3:02 p.m.: 24 IR 315)