Rule 410IAC6-8.3. Residential On-Site Sewage Systems  


Section 410IAC6-8.3-1. Definitions
Section 410IAC6-8.3-2. "AASHTO" defined
Section 410IAC6-8.3-3. "ABS" defined
Section 410IAC6-8.3-4. "ANSI" defined
Section 410IAC6-8.3-5. "ASTM" defined
Section 410IAC6-8.3-6. "Bedroom" defined
Section 410IAC6-8.3-7. "Bedroom equivalent" defined
Section 410IAC6-8.3-8. "Commissioner" defined
Section 410IAC6-8.3-9. "Construction permit" defined
Section 410IAC6-8.3-10. "Densic material" defined
Section 410IAC6-8.3-11. "Department" defined
Section 410IAC6-8.3-12. "Design daily flow" or "DDF" defined
Section 410IAC6-8.3-13. "Distribution box" defined
Section 410IAC6-8.3-14. "Drainageway" defined
Section 410IAC6-8.3-15. "Dwelling" or "residence" defined
Section 410IAC6-8.3-16. "Fill" defined
Section 410IAC6-8.3-17. "Foundation drain" defined
Section 410IAC6-8.3-18. "Health officer" defined
Section 410IAC6-8.3-19. "INDOT" defined
Section 410IAC6-8.3-20. "Interceptor drain" defined
Section 410IAC6-8.3-21. "Local health department" defined
Section 410IAC6-8.3-22. "NEMA" defined
Section 410IAC6-8.3-23. "NRCS" defined
Section 410IAC6-8.3-24. "NSF" defined
Section 410IAC6-8.3-25. "Operating permit" defined
Section 410IAC6-8.3-26. "Owner" defined
Section 410IAC6-8.3-27. "Perimeter drain" defined
Section 410IAC6-8.3-28. "Person" defined
Section 410IAC6-8.3-29. "PVC" defined
Section 410IAC6-8.3-30. "Regulatory flood elevation" or "RFE" defined
Section 410IAC6-8.3-31. "Residential drain" defined
Section 410IAC6-8.3-32. "Residential on-site sewage system" or "on-site sewage system" defined
Section 410IAC6-8.3-33. "Residential on-site sewage system failure" defined
Section 410IAC6-8.3-34. "Residential outbuilding" defined
Section 410IAC6-8.3-35. "Residential sewer" defined
Section 410IAC6-8.3-36. "Sanitary sewerage system" defined
Section 410IAC6-8.3-37. "SDR" defined
Section 410IAC6-8.3-38. "Seasonal high water table" defined
Section 410IAC6-8.3-39. "Segment drain" defined
Section 410IAC6-8.3-40. "Septic tank" defined
Section 410IAC6-8.3-41. "Sewage" defined
Section 410IAC6-8.3-42. "Soil absorption" defined
Section 410IAC6-8.3-43. "Soil absorption system" or "soil absorption field" defined
Section 410IAC6-8.3-44. "Soil horizon" defined
Section 410IAC6-8.3-45. "Soil loading rate" defined
Section 410IAC6-8.3-46. "Soil profile analysis" defined
Section 410IAC6-8.3-47. "Soil scientist" defined
Section 410IAC6-8.3-48. "Start of construction" defined
Section 410IAC6-8.3-49. "Subsurface drainage system" defined
Section 410IAC6-8.3-50. "Technology new to Indiana" or "TNI" defined
Section 410IAC6-8.3-51. Administrative authority
Section 410IAC6-8.3-52. General sewage disposal requirements
Section 410IAC6-8.3-53. Construction permits
Section 410IAC6-8.3-54. Operating permits
Section 410IAC6-8.3-55. Violations; permit denial and revocation
Section 410IAC6-8.3-56. On-site evaluation
Section 410IAC6-8.3-57. Separation distances
Section 410IAC6-8.3-58. Dispersal area
Section 410IAC6-8.3-59. Drainage
Section 410IAC6-8.3-60. Septic tanks: general requirements
Section 410IAC6-8.3-61. Septic tanks: construction details
Section 410IAC6-8.3-62. Dosing tanks
Section 410IAC6-8.3-63. Septic tanks and dosing tanks: installation and maintenance
Section 410IAC6-8.3-64. Outlet filters
Section 410IAC6-8.3-65. Effluent pumps
Section 410IAC6-8.3-66. Distribution box specifications
Section 410IAC6-8.3-67. Pipe specifications
Section 410IAC6-8.3-68. Aggregate specifications
Section 410IAC6-8.3-69. Barrier materials
Section 410IAC6-8.3-70. Subsurface trench on-site sewage system site suitability
Section 410IAC6-8.3-71. Subsurface trench on-site sewage system type selection criteria
Section 410IAC6-8.3-72. Elevated sand mound on-site sewage system site suitability
Section 410IAC6-8.3-73. Table for on-site sewage system selection
Section 410IAC6-8.3-74. Subsurface trench on-site sewage systems: general design and construction requirements
Section 410IAC6-8.3-75. Subsurface trench gravity on-site sewage systems: design and construction requirements
Section 410IAC6-8.3-76. Subsurface trench flood dosed on-site sewage systems: design and construction requirements
Section 410IAC6-8.3-77. Subsurface trench alternating field on-site sewage systems: design and construction requirements
Section 410IAC6-8.3-78. Subsurface trench pressure distribution on-site sewage systems: design and construction requirements
Section 410IAC6-8.3-79. Elevated sand mound on-site sewage systems: design of the aggregate bed
Section 410IAC6-8.3-80. Elevated sand mound on-site sewage systems: design of basal area
Section 410IAC6-8.3-81. Elevated sand mound on-site sewage systems: dimensions of the elevated sand mound
Section 410IAC6-8.3-82. Elevated sand mound on-site sewage systems: pressure distribution network
Section 410IAC6-8.3-83. Elevated sand mound on-site sewage systems: protection of the site
Section 410IAC6-8.3-84. Elevated sand mound on-site sewage systems: requirements for system construction
Section 410IAC6-8.3-85. Elevated sand mound on-site sewage systems: installation of the effluent force main
Section 410IAC6-8.3-86. Elevated sand mound on-site sewage systems: preparation of the site
Section 410IAC6-8.3-87. Elevated sand mound on-site sewage systems: placement of the sand on the basal area
Section 410IAC6-8.3-88. Elevated sand mound on-site sewage systems: construction of the aggregate bed
Section 410IAC6-8.3-89. Elevated sand mound on-site sewage systems: placement of the soil material and final grade
Section 410IAC6-8.3-90. Abandonment of an on-site sewage system
Section 410IAC6-8.3-91. Matters incorporated by reference