Section 327IAC3-6-20. Excavation water; pressure test water  


Latest version.
  •    (a) All water entering a sanitary sewer project excavation, prior to construction completion, shall be removed.

      (b) All excavation water or pressure test water shall be disposed in one (1) of the following manners:

    (1) Disposal to a sanitary sewer only after receiving the approval of the local sewer authority.

    (2) Disposal to a location other than a sanitary sewer in accordance with state and federal laws and regulations.

    (Water Pollution Control Division; 327 IAC 3-6-20; filed May 17, 1999, 12:11 p.m.: 22 IR 3095; readopted filed Apr 11, 2005, 2:45 p.m.: 28 IR 2470; readopted filed Jun 15, 2011, 11:15 a.m.: 20110713-IR-327110193BFA)