Indiana Administrative Code (Last Updated: December 20, 2016) |
Title 327. WATER POLLUTION CONTROL DIVISION |
Article 327IAC3. WASTEWATER TREATMENT FACILITIES; ISSUANCE OF PERMITS; CONSTRUCTION AND PERMIT REQUIREMENTS |
Rule 327IAC3-6. Technical Standards for Sanitary Collection Systems |
Section 327IAC3-6-20. Excavation water; pressure test water
Latest version.
-
(a) All water entering a sanitary sewer project excavation, prior to construction completion, shall be removed.
(b) All excavation water or pressure test water shall be disposed in one (1) of the following manners:
(1) Disposal to a sanitary sewer only after receiving the approval of the local sewer authority.
(2) Disposal to a location other than a sanitary sewer in accordance with state and federal laws and regulations.
(Water Pollution Control Division; 327 IAC 3-6-20; filed May 17, 1999, 12:11 p.m.: 22 IR 3095; readopted filed Apr 11, 2005, 2:45 p.m.: 28 IR 2470; readopted filed Jun 15, 2011, 11:15 a.m.: 20110713-IR-327110193BFA)