Section 327IAC8-3.2-17. Installation  


Latest version.
  •    (a) All water mains and their accessories shall be installed and pressure and leak tested in accordance with the applicable provisions of one (1) of the following:

    (1) C600-99 AWWA Standard for Installation of Ductile-Iron Water Mains and Their Appurtenances.

    (2) C602-00 AWWA Standard for Cement-Mortar Lining of Water Pipelines in Place, 4 in (100 mm) and Larger.

    (3) C603-96(R00) AWWA Standard for Installation of Asbestos Cement Pressure Pipe.

    (4) C605-94 AWWA Standard for Underground Installation of Polyvinyl Chloride (PVC) Pressure Pipe and Fittings for Water.

    (5) C606-04 Grooved and Shouldered Joints.

    If an AWWA Standard is not available for the particular installation, the manufacturer’s recommended installation procedure shall be followed.

      (b) Continuous and uniform bedding shall be provided in the trench for all buried pipe. Backfill material shall be tamped in layers around the pipe and to a sufficient height above the pipe to adequately support and protect the pipe. All stones unable to pass through a U.S. Standard Sieve opening of two (2) inches that are found in the trench within six (6) inches of the outside edge of the pipe shall be removed.

      (c) All necessary reaction blocking, tie rods, or joints designed to prevent movement for pipes and fittings (regardless of material type) at tees, bends, plugs, and hydrants shall be installed to prevent movement in conformance with AWWA Standard C600-99.

      (d) Water mains shall be covered with earthen cover in accordance with the following:

    Depth of Cover Requirements for Water Mains

    County

    Cover[1] (in)

    Adams

    60

    Allen

    60

    Bartholomew

    48

    Benton

    60

    Blackford

    60

    Boone

    54

    Brown

    48

    Carroll

    60

    Cass

    60

    Clark

    36

    Clay

    54

    Clinton

    54

    Crawford

    36

    Daviess

    48

    Dearborn

    48

    Decatur

    48

    Dekalb

    60

    Delaware

    60

    Dubois

    42

    Elkhart

    60

    Fayette

    54

    Floyd

    36

    Fountain

    60

    Franklin

    48

    Fulton

    60

    Gibson

    42

    Grant

    60

    Greene

    54

    Hamilton

    54

    Hancock

    54

    Harrison

    36

    Hendricks

    54

    Henry

    54

    Howard

    60

    Huntington

    60

    Jackson

    48

    Jasper

    60

    Jay

    60

    Jefferson

    42

    Jennings

    48

    Johnson

    54

    Knox

    48

    Kosciusko

    60

    LaGrange

    60

    Lake

    60

    LaPorte

    60

    Lawrence

    48

    Madison

    60

    Marion

    54

    Marshall

    60

    Martin

    48

    Miami

    60

    Monroe

    48

    Montgomery

    60

    Morgan

    48

    Newton

    60

    Noble

    60

    Ohio

    42

    Orange

    42

    Owen

    54

    Parke

    60

    Perry

    36

    Pike

    42

    Porter

    60

    Posey

    42

    Pulaski

    60

    Putnam

    54

    Randolph

    54

    Ripley

    48

    Rush

    54

    St. Joseph

    60

    Scott

    36

    Shelby

    54

    Spencer

    36

    Starke

    60

    Steuben

    60

    Sullivan

    54

    Switzerland

    42

    Tippecanoe

    60

    Tipton

    60

    Union

    48

    Vanderburgh

    36

    Vermillion

    60

    Vigo

    60

    Wabash

    60

    Warren

    60

    Warrick

    36

    Washington

    36

    Wayne

    54

    Wells

    60

    White

    60

    Whitley

    60

    [1] The cover dimension is measured from the top of pipe to the proposed finish grade.

    (Water Pollution Control Division; 327 IAC 8-3.2-17; filed Mar 31, 1999, 1:50 p.m.: 22 IR 2506; errata filed Aug 30, 1999, 12:06 p.m.: 23 IR 25; readopted filed Jan 10, 2001, 3:23 p.m.: 24 IR 1518; filed Apr 24, 2006, 3:00 p.m.: 29 IR 2956; readopted filed Nov 21, 2007, 1:16 p.m.: 20071219-IR-327070553BFA; readopted filed Jul 29, 2013, 9:21 a.m.: 20130828-IR-327130176BFA)