Section 326IAC2-8-6. Federally enforceable requirements  


Latest version.
  •    (a) The commissioner may not issue a FESOP that waives, or makes less stringent, any limitation or requirement contained in or issued under the state implementation plan (SIP) or requirements that are otherwise federally enforceable under the CAA. Permits that do not conform to the requirements of this rule and the requirements of U.S. EPA's underlying regulations may be deemed by the U.S. EPA not federally enforceable.

      (b) All terms and conditions in a FESOP, including any provisions designed to limit a source's potential to emit, are enforceable by the U.S. EPA and citizens under the CAA. (Air Pollution Control Division; 326 IAC 2-8-6; filed May 25, 1994, 11:00 a.m.: 17 IR 2274)