Section 675IAC20-3-6. Inlets  


Latest version.
  •    (a) Spa inlets and outlets shall be arranged to produce a uniform circulation of water throughout the spa.

      (b) Water velocity in the spa piping shall not exceed ten (10) feet per second with the following exceptions:

    (1) Suction velocity shall not exceed six (6) feet per second.

    (2) Water velocity in existing asbestos cement pipe shall not exceed six (6) feet per second.

    (3) Water velocity in copper pipe shall not exceed eight (8) feet per second.

      (c) All spas shall have a surface skimming (overflow) system and dual drain outlets at the lowest point on the spa floor. The dual drains shall be spaced at least three (3) feet apart. When skimmers are the sole overflow system, not less than one (1) skimmer shall be provided for each one hundred (100) square feet, or portion thereof, of water surface. (Fire Prevention and Building Safety Commission; 675 IAC 20-3-6; filed Aug 14, 1989, 9:00 a.m.: 13 IR 61, eff Sep 1, 1989 [IC 4-22-2-36 suspends the effectiveness of a rule document for thirty (30) days after filing with the secretary of state. LSA Document #89-17 was filed Aug 14, 1989.]; readopted filed Sep 11, 2001, 2:49 p.m.: 25 IR 530; filed Nov 25, 2002, 9:00 a.m.: 26 IR 1103; readopted filed Sep 21, 2007, 9:20 a.m.: 20071010-IR-675070388RFA; readopted filed Oct 10, 2007, 9:16 a.m: 20071031-IR-675070388RFA; filed Mar 25, 2011, 10:19 a.m.: 20110420-IR-675090789FRA; readopted filed Aug 7, 2013, 8:51 a.m.: 20130904-IR-675130181RFA)