Section 675IAC15-2-99. Electrical tests


Latest version.
  •    (a) Dielectric Strength Test. The wiring of each mobile structure shall be subjected to a one (1) minute, nine hundred (900) volt dielectric strength test (with all switches closed) between live parts (including neutral and the mobile structure ground). Alternatively, the test may be performed at one thousand eighty (1080) volts for one (1) second. This test shall be performed after branch circuits are complete and after fixtures or appliances are installed.

    EXCEPTION: Fixtures or appliances which are listed shall not be required to withstand the dielectric strength test.

      (b) Continuity and Operational Tests and Polarity Checks. Each mobile structure shall be subjected to:

    (1) an electrical continuity test to assure that all exposed electrically conductive parts are properly bonded;

    (2) an electrical operational test to demonstrate that all equipment, except water heaters and electric furnaces, is connected and in working order; and

    (3) electrical polarity checks of permanently wired equipment and receptacle outlets to determine that connections have been properly made.

    (Fire Prevention and Building Safety Commission; 675 IAC 15-2-99; filed Mar 25, 1986, 1:44 pm: 9 IR 2022, eff Jun 15, 1986; readopted filed Nov 29, 2001, 12:21 p.m.: 25 IR 1306; readopted filed Sep 21, 2007, 9:20 a.m.: 20071010-IR-675070388RFA; readopted filed Oct 10, 2007, 9:16 a.m: 20071031-IR-675070388RFA; readopted filed Aug 4, 2011, 8:35 a.m.: 20110831-IR-675110254RFA)