Indiana Administrative Code (Last Updated: December 20, 2016) |
Title 329. SOLID WASTE MANAGEMENT DIVISION |
Article 329IAC9. UNDERGROUND STORAGE TANKS |
Rule 329IAC9-1. Applicability; Definitions |
Section 329IAC9-1-22. "Flow-through process tank" defined
Latest version.
-
"Flow-through process tank" means a tank that forms an integral part of a production process through which there is a steady, variable, recurring, or intermittent flow of materials during the operation of the process. Flow-through process tanks do not include tanks used for any of the following:
(1) The storage of materials prior to their introduction into the production process.
(2) The storage of finished products or byproducts from the production process.
(Solid Waste Management Division; 329 IAC 9-1-22; filed Dec 1, 1992, 5:00 p.m.: 16 IR 1065; filed Jul 19, 1999, 12:00 p.m.: 22 IR 3690; readopted filed Jan 10, 2001, 3:25 p.m.: 24 IR 1535)