Section 329IAC10-5-2. Application requirements  


Latest version.
  •    (a) All industries operating before the effective date of this rule are subject to this rule and must file a complete application with the commissioner for a permit under this article or submit the following information:

    (1) The name and address of the facility producing the solid waste.

    (2) A description of the process or processes producing the solid waste.

    (3) Information on the total quantity of solid waste produced.

    (4) A description of the appearance of the material, any odor produced by the material, and the susceptibility of the material to wind and water dispersal.

    (5) Information on the chemical and physical characteristics of the solid waste, including the following:

    (A) Composition.

    (B) Density.

    (C) Leachability.

    (D) Reactivity.

    (E) Ignitability.

    (F) Toxicity.

    (6) Information on all known hazards associated with the waste.

    (7) A description of the current method and location of disposal.

      (b) The information submitted must be identified as the information necessary to satisfy the requirements of this rule and must be signed as required by 329 IAC 10-11-3. (Solid Waste Management Division; 329 IAC 10-5-2; filed Mar 14, 1996, 5:00 p.m.: 19 IR 1797; errata filed Apr 4, 1996, 4:00 p.m.: 19 IR 2045; readopted filed Jan 10, 2001, 3:25 p.m.: 24 IR 1535)