Indiana Administrative Code (Last Updated: December 20, 2016) |
Title 329. SOLID WASTE MANAGEMENT DIVISION |
Article 329IAC10. SOLID WASTE LAND DISPOSAL FACILITIES |
Rule 329IAC10-34. Restricted Waste Site Type III and Construction/Demolition Sites; Liner System Design Standards |
Section 329IAC10-34-1. Design standards
-
(a) On and after the effective date of this article, for a restricted waste site Type III and a construction/demolition site, the increased height and horizontal expansions of the fill area, beyond that which had been approved previously and for new facilities, must have a barrier between the solid waste and an aquifer. This barrier must:
(1) consist of soil, whether undisturbed, constructed, or a combination thereof, with an equivalent hydraulic conductivity through the barrier of less than or equal to 1 × 10-6 centimeters per second; and
(2) have a minimum thickness consisting of three (3) feet between the solid waste and any locally useful aquifer.
(b) Barrier thickness as specified in subsection (a) may be increased due to cation exchange capacities less than ten (10) milliequivalents per one hundred (100) grams or decreased due to lack of ground water resources in the area or alternate technology such as synthetic liners and leachate collection. (Solid Waste Management Division; 329 IAC 10-34-1; filed Mar 14, 1996, 5:00 p.m.: 19 IR 1911; readopted filed Jan 10, 2001, 3:25 p.m.: 24 IR 1535; readopted filed May 14, 2007, 1:53 p.m.: 20070523-IR-329070138BFA; readopted filed Jul 29, 2013, 9:20 a.m.: 20130828-IR-329130179BFA)