Section 329IAC10-27-2. Preoperational requirements


Latest version.
  •    Before beginning operation, owners or operators of restricted waste sites Type I and Type II and nonmunicipal solid waste landfills shall be required to do the following:

    (1) Establish a series of identifiable boundary markers that will delineate the approved facility boundaries and solid waste boundaries for the life of the facility.

    (2) Complete initial site development and construction in accordance with the initial facility development plan required in 329 IAC 10-24 and complete other preoperational requirements imposed as conditions to the facility permit.

    (3) Establish permanent, on-site benchmark or benchmarks with vertical, mean sea level elevation, and horizontal control so that no portion of the proposed fill area is further than one thousand (1,000) feet from a benchmark. However, distances greater than the specified one thousand (1,000) feet may be allowed where necessary to avoid the placement of benchmarks on filled areas.

    (4) Install any required ground water monitoring devices in accordance with 329 IAC 10-29.

    (Solid Waste Management Division; 329 IAC 10-27-2; filed Mar 14, 1996, 5:00 p.m.: 19 IR 1895; readopted filed Jan 10, 2001, 3:25 p.m.: 24 IR 1535; readopted filed May 14, 2007, 1:53 p.m.: 20070523-IR-329070138BFA; readopted filed Jul 29, 2013, 9:20 a.m.: 20130828-IR-329130179BFA)