Section 329IAC10-17-4. Soil component of the liner; design requirements  


Latest version.
  •    The soil components of the liner systems described in section 2 of this rule must meet the following requirements:

    (1) Be constructed on a slope of no less than two percent (2%) toward the leachate collection pipes.

    (2) Meet the specified thickness and hydraulic conductivity requirements of section 2 of this rule, as appropriate to the location of the proposed MSWLF unit.

    (3) Be composed of lifts, each having a maximum thickness that:

    (A) is specified in the approved construction plan or is otherwise approved by the commissioner; and

    (B) in no case exceeds nine (9) inches after compaction.

    (4) Have a design that adequately addresses the following factors:

    (A) Protection from damage due to uplift from hydrostatic forces.

    (B) Prevention of damage due to freeze/thaw and wet/dry cycles.

    (C) Any additional factors that are necessary to obtain an adequate soil component as specified in the construction plans or as determined by the commissioner.

    (Solid Waste Management Division; 329 IAC 10-17-4; filed Mar 14, 1996, 5:00 p.m.: 19 IR 1833; filed Mar 19, 1998, 11:07 a.m.: 21 IR 2776; filed Aug 2, 1999, 11:50 a.m.: 22 IR 3814)