Rule 327IAC8-3.4. Public Water System Wells  


Section 327IAC8-3.4-1. Definitions
Section 327IAC8-3.4-2. Applicability
Section 327IAC8-3.4-3. Certification
Section 327IAC8-3.4-4. Required information regarding the location of a proposed production well
Section 327IAC8-3.4-5. Required information regarding the mechanics of a new production well
Section 327IAC8-3.4-6. Postconstruction submittal of information
Section 327IAC8-3.4-7. Required easements, other permits
Section 327IAC8-3.4-8. Production well materials
Section 327IAC8-3.4-9. Separation of a production well from a potential or existing source of microbiological or chemical contamination or damage
Section 327IAC8-3.4-9.1. Sanitary setback requirements for replacement wells at noncommunity public water systems
Section 327IAC8-3.4-10. Production well design criteria
Section 327IAC8-3.4-11. Production well minimum diameter
Section 327IAC8-3.4-12. Flow rate and pressure requirements
Section 327IAC8-3.4-13. Backup provisions for production wells
Section 327IAC8-3.4-14. Hydropneumatic storage tanks
Section 327IAC8-3.4-15. Discharge piping
Section 327IAC8-3.4-16. Casing and screen requirements
Section 327IAC8-3.4-17. Pitless adapter unit requirements
Section 327IAC8-3.4-18. Cross connection control requirements
Section 327IAC8-3.4-19. Emergency operation of a production well
Section 327IAC8-3.4-20. Rotary well drilling procedure requirements
Section 327IAC8-3.4-21. Cable tool well drilling procedure requirements
Section 327IAC8-3.4-22. Bucket well requirements
Section 327IAC8-3.4-23. Grouting requirements
Section 327IAC8-3.4-24. Disinfection procedure requirements
Section 327IAC8-3.4-25. Postconstruction testing and reporting requirements
Section 327IAC8-3.4-26. Conversion of a nonproduction well to a production well
Section 327IAC8-3.4-27. Alternative to technical standards