Section 327IAC8-3-5.7. Notification of construction  


Latest version.
  •   7. The permittee must notify the commissioner a minimum of ten (10) days, excluding Saturdays, Sundays, and state of Indiana holidays, before exercising a permit issued by the commissioner in accordance with this rule. The notification must include the following information:

    (1) The construction permit number assigned by the commissioner.

    (2) The location of the construction.

    (3) A description of the construction.

    (4) Anticipated duration of the construction.

    (5) The phone number of the permittee or permittee’s representative who will be present during the construction.

    (Water Pollution Control Division; 327 IAC 8-3-5.7; filed Mar 31, 1999, 1:50 p.m.: 22 IR 2498; readopted filed Jan 10, 2001, 3:23 p.m.: 24 IR 1518; readopted filed Nov 21, 2007, 1:16 p.m.: 20071219-IR-327070553BFA; readopted filed Jul 29, 2013, 9:21 a.m.: 20130828-IR-327130176BFA)