Section 327IAC5-1.5-47. "Proposed permit" defined  


Latest version.
  •    "Proposed permit" means an NPDES permit prepared after the close of the public comment period (and, when applicable, any public hearing and administrative appeals) that is sent to EPA for review before final issuance by the state. A proposed permit shall be distinguished from a draft permit. A denial of a request for modification, revocation and reissuance, or termination is neither a draft permit nor a proposed permit. (Water Pollution Control Division; 327 IAC 5-1.5-47; filed Jan 14, 1997, 12:00 p.m.: 20 IR 1418; readopted filed Jan 10, 2001, 3:23 p.m.: 24 IR 1518; readopted filed Nov 21, 2007, 1:16 p.m.: 20071219-IR-327070553BFA; readopted filed Jul 29, 2013, 9:21 a.m.: 20130828-IR-327130176BFA)