Section 327IAC5-21-9. Monitoring


Latest version.
  •    Monitoring requirements shall be specified in an IWP permit:

    (1) to assure compliance with discharge limitations and other terms and conditions of the permit;

    (2) in accordance with the provisions of 327 IAC 5-2-13(c) through 327 IAC 5-2-13(e); and

    (3) may include monitoring for one (1) or more of the following:

    (A) Pollutant mass.

    (B) Pollutant concentration.

    (C) Other appropriate measurement for each pollutant as well as other parameters and conditions specified in the permit.

    (Water Pollution Control Division; 327 IAC 5-21-9; filed Oct 10, 2000, 3:02 p.m.: 24 IR 316)