Section 327IAC15-5-5. NOI requirements  


Latest version.
  •    (a) A complete NOI letter must contain the following:

    (1) Name, mailing address, and location of the project site for which the notification is submitted.

    (2) The project site owner's name, address, telephone number, e-mail address (if available), ownership status as federal, state, public, private, or other entity.

    (3) Contact person (if different than project site owner), person's name, company name, address, e-mail address (if available), and telephone number.

    (4) A brief description of the construction project, including a statement of the total acreage of the project site. Total acreage claimed in the NOI letter shall be consistent with the acreage covered in the construction plan.

    (5) Estimated dates for initiation and completion of construction activities. Within forty-eight (48) hours of the initiation of construction activity, the project site owner must notify the commissioner and the appropriate plan reviewing agency of the actual project start date.

    (6) The latitude and longitude of the approximate center of the project site to the nearest fifteen (15) seconds, and the nearest quarter section, township, range, and civil township in which the project site is located.

    (7) Total impervious surface area, in square feet, of the final project site including structures, roads, parking lots, and other similar improvements.

    (8) The number of acres to be involved in the construction activities.

    (9) Proof of publication in a newspaper of general circulation in the affected area that notified the public that a construction activity is to commence, that states, "(Company name, address) is submitting an NOI letter to notify the Indiana Department of Environmental Management of our intent to comply with the requirements under 327 IAC 15-5 to discharge storm water from construction activities for the following project: (name of the construction project, address of the location of the construction project). Run-off from the project site will discharge to (stream(s) receiving the discharge(s)).".

    (10) As applicable, a list of all MS4 areas designated under 327 IAC 15-13 within which the project site lies.

    (11) A written certification by the operator that:

    (A) the storm water quality measures included in the construction plan comply with the requirements under sections 6.5, 7, and 7.5 of this rule and that the storm water pollution prevention plan complies with all applicable federal, state, and local storm water requirements;

    (B) the measures required by section 7 of this rule will be implemented in accordance with the storm water pollution prevention plan;

    (C) if the projected land disturbance is one (1) acre or more, the applicable soil and water conservation district or other entity designated by the department has been sent a copy of the construction plan for review;

    (D) storm water quality measures beyond those specified in the storm water pollution prevention plan will be implemented during the life of the permit if necessary to comply with section 7 of this rule; and

    (E) implementation of storm water quality measures will be inspected by trained individuals.

    (12) The name of receiving water or, if the discharge is to a municipal separate storm sewer, the name of the municipal operator of the storm sewer and the ultimate receiving water.

    (13) The NOI letter must be signed by a person meeting the signatory requirements in 327 IAC 15-4-3(g) and 327 IAC 15-4-3(h).

    (14) A notification from the SWCD, or other entity designated by the department as the reviewing agency indicating that the constructions plans comply with this rule. This requirement may be waived if the project site owner has not received notification from the reviewing agency within the time frame specified in 327 IAC 15-5-6(b)(3).

      (b) Send NOI letters to:

    Indiana Department of Environmental Management

    Office of Water Quality

    100 North Senate Avenue, Room N1255

    Indianapolis, Indiana 46204.

    (Water Pollution Control Division; 327 IAC 15-5-5; filed Aug 31, 1992, 5:00 p.m.: 16 IR 24; errata filed Sep 10, 1992, 12:00 p.m.: 16 IR 65; readopted filed Jan 10, 2001, 3:23 p.m.: 24 IR 1518; filed Oct 27, 2003, 10:15 a.m.: 27 IR 836; errata filed Feb 6, 2006, 11:15 a.m.: 29 IR 1938; readopted filed Nov 21, 2007, 1:16 p.m.: 20071219-IR-327070553BFA; readopted filed Jul 29, 2013, 9:21 a.m.: 20130828-IR-327130176BFA; filed Oct 9, 2015, 4:07 p.m.: 20151104-IR-327100659FRA)