Section 326IAC8-9-4. Standards  


Latest version.
  •    (a) The owner or operator of each vessel with a capacity greater than or equal to thirty-nine thousand (39,000) gallons, that stores VOL with a maximum true vapor pressure greater than or equal to seventy-five hundredths (0.75) pound per square inch absolute (psia) but less than eleven and one-tenth (11.1) psia shall do the following:

    (1) On or before May 1, 1996, for each vessel having a permanently affixed roof, install one (1) of the following:

    (A) An internal floating roof meeting the standards in subsection (c).

    (B) A closed vent system and control device meeting the standards in subsection (d).

    (C) An equivalent emissions control system resulting in equivalent emissions reductions to that obtained in clause (A).

    (2) For each vessel having an internal floating roof, install one (1) of the following:

    (A) At the time of the next scheduled cleaning, but not later than ten (10) years after May 1, 1996, an internal floating roof meeting the standards in subsection (c).

    (B) On or before May 1, 1996, a closed vent system and control device meeting the standards in subsection (d).

    (C) On or before May 1, 1996, an equivalent emissions control system resulting in equivalent emissions reductions to that obtained in clause (A).

    (3) For each vessel having an external floating roof, install one (1) of the following:

    (A) At the time of the next scheduled cleaning, but not later than ten (10) years after May 1, 1996, an external floating roof meeting the standards in subsection (e).

    (B) On or before May 1, 1996, a closed vent system meeting the standards in subsection (d).

    (C) On or before May 1, 1996, an equivalent emissions control system resulting in equivalent emissions reductions to that obtained in clause (A).

    (4) For each vessel subject to this subsection, the owner or operator described in the report required in section 6(b) of this rule, install one (1) of the following:

    (A) Emission control equipment.

    (B) A schedule for vessel cleaning and installation of emission control equipment.

      (b) On or before May 1, 1996, the owner or operator of each vessel with a capacity greater than or equal to thirty-nine thousand (39,000) gallons, that stores VOL with a maximum true vapor pressure greater than or equal to eleven and one-tenth (11.1) psia shall equip each vessel with a closed vent system with a control device meeting the standards of subsection (d).

      (c) Standards applicable to each internal floating roof are as follows:

    (1) The internal floating roof shall float on the liquid surface, but not necessarily in complete contact with it, inside a vessel that has a permanently affixed roof.

    (2) The internal floating roof shall be floating on the liquid surface at all times, except during initial fill and during those intervals when the vessel is completely emptied or subsequently emptied and refilled.

    (3) When the roof is resting on the leg supports, the process of filling, emptying, or refilling shall be continuous and shall be accomplished as rapidly as possible.

    (4) Each internal floating roof shall be equipped with one (1) of the following closure devices between the wall of the vessel and the edge of the internal floating roof:

    (A) A foam or liquid-filled seal mounted in contact with the liquid (liquid-mounted seal).

    (B) Two (2) seals mounted one (1) above the other so that each forms a continuous closure that completely covers the space between the wall of the vessel and the edge of the internal floating roof. The lower seal may be vapor-mounted, but both must be continuous.

    (C) A mechanical shoe seal that consists of a metal sheet held vertically against the wall of the vessel by springs or weighted levers and that is connected by braces to the floating roof. A flexible coated fabric, or envelope, spans the annular space between the metal sheet and the floating roof.

    (5) Each opening in a noncontact internal floating roof except for automatic bleeder vents (vacuum breaker vents) and the rim space vents shall provide a projection below the liquid surface.

    (6) Each opening in the internal floating roof except for leg sleeves, automatic bleeder vents, rim space vents, column wells, ladder wells, sample wells, and stub drains shall be equipped with a cover or lid that shall be maintained in a closed position at all times (with no visible gap) except when the device is in actual use. The cover or lid shall be equipped with a gasket. Covers on each access hatch and automatic gauge float well shall be bolted except when they are in use.

    (7) Automatic bleeder vents shall be equipped with a gasket and shall be closed at all times when the roof is floating except when the roof is being floated off or is being landed on the roof leg supports.

    (8) Rim space vents shall be equipped with a gasket and shall be set to open only when the internal floating roof is not floating or at the manufacturer’s recommended setting.

    (9) Each penetration of the internal floating roof for the purpose of sampling shall be a sample well. The sample well shall have a slit fabric cover that covers at least ninety percent (90%) of the opening.

    (10) Each penetration of the internal floating roof that allows for passage of a ladder shall have a gasketed sliding cover.

      (d) Standards applicable to each closed vent system and control device are as follows:

    (1) The closed vent system shall be designed to collect all VOC vapors and gases discharged from the vessel and operated with no detectable emission as indicated by an instrument reading of less than five hundred (500) parts per million (ppm) above background and visual inspections as determined by the methods specified in 40 CFR 60, Subpart VV, 60.485(C)*.

    (2) The control device shall be designed and operated to reduce inlet VOC emissions by ninety-five percent (95%) or greater. If a flare is used as the control device, it shall meet the specifications described in the general control device requirements in 40 CFR 60.18, General Provisions*.

      (e) Standards applicable to each external floating roof are as follows:

    (1) Each external floating roof shall be equipped with a closure device between the wall of the vessel and the roof edge. The closure device shall consist of two (2) seals, one (1) above the other. The lower seal shall be referred to as the primary seal; the upper seal shall be referred to as the secondary seal.

    (2) Except as provided in section 5(c)(4) of this rule, the primary seal shall completely cover the annular space between the edge of the floating roof and vessel wall and shall be either a liquid-mounted seal or a shoe seal.

    (3) The secondary seal shall completely cover the annular space between the external floating roof and the wall of the vessel in a continuous fashion except as allowed in section 5(c)(4) of this rule.

    (4) Except for automatic bleeder vents and rim space vents, each opening in a noncontact external floating roof shall provide a projection below the liquid surface.

    (5) Except for automatic bleeder vents, rim space vents, roof drains, and leg sleeves, each opening in the roof shall be equipped with a gasketed cover, seal, or lid that shall be maintained in a closed position at all times, without visible gap, except when the device is in actual use.

    (6) Automatic bleeder vents shall be closed at all times when the roof is floating except when the roof is being floated off or is being landed on the roof leg supports.

    (7) Rim vents shall be set to open when the roof is being floated off the roof leg supports or at the manufacturer’s recommended setting. Automatic bleeder vents and rim space vents shall be gasketed.

    (8) Each emergency roof drain shall be provided with a slotted membrane fabric cover that covers at least ninety percent (90%) of the area of the opening.

    (9) The roof shall be floating on the liquid at all times, for example, off the roof leg supports, except when the vessel is completely emptied and subsequently refilled. The process of filling, emptying, or refilling when the roof is resting on the leg supports shall be continuous and shall be accomplished as rapidly as possible.

      *These documents are incorporated by reference. Copies may be obtained from the Government Printing Office, 732 North Capitol Street NW, Washington, D.C. 20401 or are available for review and copying at the Indiana Department of Environmental Management, Office of Air Quality, Indiana Government Center-North, Tenth Floor, 100 North Senate Avenue, Indianapolis, Indiana 46204. (Air Pollution Control Division; 326 IAC 8-9-4; filed Dec 19, 1995, 3:10 p.m.: 19 IR 1057; errata filed Dec 12, 2002, 3:35 p.m.: 26 IR 1568; filed Aug 26, 2004, 11:30 a.m.: 28 IR 52)