Section 326IAC7-4-8. Vermillion County sulfur dioxide emission limitations  


Latest version.
  •    The following sources and facilities located in Vermillion County shall comply with the sulfur dioxide emission limitations in pounds per million Btu and other requirements:

     

    Source

    Facility Description

    Emission Limitations

     

    (1) Public Service Indiana Cayuga (PSI)

    Boiler 1 and Boiler 2:

    On or before December 31, 1988

    4.84 each

     

     

    On or before March 1, 1989

    4.40 each

    (A) Upon certification by PSI to the commissioner that the Universal Mine cannot assure a long term supply of compliance coal, final compliance with the four and forty-hundredths (4.40) pounds per million Btu sulfur dioxide emission limitation may be extended until December 31, 1989. The commissioner shall notify the U.S. EPA upon receipt of such a certification by PSI.

    (B) PSI may at any time petition the commissioner for a four and forty-eight hundredths (4.48) pounds per million Btu final sulfur dioxide emission limitation. The petition shall include evidence that such a limitation will protect the sulfur dioxide ambient air quality standards on all land not fenced or otherwise effectively restricted from public access. If the commissioner approves such a petition, the department shall amend the operation permit according to procedures specified in 326 IAC 2 and submit the revised permit to U.S. EPA.

     

    (2) Newport Army Ammunition

    Boilers 103A, 103B, 103C, and 7700D

    1.6 each

     

    (3) Eli Lilly Clinton Laboratories

    Boiler C31-1

    Boiler C21-4, C21-1, C21-2, and C21-3

    4.72

    0.36 each

    (Air Pollution Control Division; 326 IAC 7-4-8; filed Aug 28, 1990, 4:50 p.m.: 14 IR 74; readopted filed Jan 10, 2001, 3:20 p.m.: 24 IR 1477)