Section 326IAC2-1.1-7. Fees  


Latest version.
  •    (a) In accordance with this section, the applicant shall pay a fee based upon the cost to the commissioner of processing and reviewing applications or requirements for the following:

    (1) A permit.

    (2) An operating agreement.

    (3) A registration.

    (4) A modification.

    (5) A revision.

    (6) The cost of determining compliance with the terms and conditions of a permit.

    (7) Any other applicable authorization identified in this section.

      (b) Fees shall be paid in accordance with the following:

    (1) For the fees described in subsection (c), the commissioner shall either:

    (A) adjust the base fee, the cost per ton of emissions fee, and the maximum fee annually by the consumer price index (CPI) using the revision of the CPI that is most consistent with the CPI for the calendar year 1995; or

    (B) submit a fee adequacy demonstration to U.S. EPA that demonstrates that the current level of fees provides sufficient funds for operation of the Title V permit program.

    (2) Except for the fees described in subsection (c), the commissioner may adjust all fees on January 1 of each calendar year by the CPI using the revision of the CPI that is most consistent with the CPI for the calendar year 1995. Fees listed in this section may have been adjusted by the CPI. Bills shall reflect most current fee schedule.

    (3) Except for interim permits under subsection (l), fees shall be paid:

    (A) by mail or in person;

    (B) upon billing by check or money order, payable to "Cashier, Indiana Department of Environmental Management"; and

    (C) no later than thirty (30) days after receipt of the billing.

    Nonpayment may result in denial of a permit application or revocation of the permit.

    (4) If an annual fee is being paid under a fee payment schedule established under IC 13-16-2, the fee shall be paid in accordance with that schedule. Establishment of a fee payment schedule must be consistent with IC 13-16-2, including the determination that:

    (A) a single payment of the entire fee is an undue hardship on the person; and

    (B) the commissioner is not required to assess installments separately.

    Failure to pay in accordance with the fee payment schedule that results in substantial nonpayment of the fee may result in revocation of the permit.

    (5) Fees are nonrefundable. The fees shall neither be refunded nor applied to any subsequent application or reapplication, if the:

    (A) permit is denied or revoked;

    (B) source or emissions unit is shut down; or

    (C) application is withdrawn after the start of the public comment period.

      (c) The Title V operating permit program trust fund described in 326 IAC 2-7-19 and 326 IAC 2-8-16 includes all fees from the following sources:

    (1) Part 70 sources under 326 IAC 2-7.

    (2) FESOP sources under 326 IAC 2-8.

    (3) SSOA sources under 326 IAC 2-9.

      (d) A source that applies for a Part 70 permit under 326 IAC 2-7 shall submit the following fees, as applicable:

    (1) Six hundred twenty-five dollars ($625) for the following:

    (A) Minor source modification under 326 IAC 2-7-10.5(e).

    (B) Permit renewal with minor source modification under:

    (i) 326 IAC 2-7-4 or 326 IAC 2-7-8; and

    (ii) 326 IAC 2-7-10.5(e).

    (2) Four thousand three hundred seventy-five dollars ($4,375) for the following permits that are not subject to PSD under 326 IAC 2-2, or emission offsets under 326 IAC 2-3 or section 5 of this rule:

    (A) Construction permit under 326 IAC 2-5.1.

    (B) Significant source modification under 326 IAC 2-7-10.5(g).

    (C) Permit renewal with significant source modification under:

    (i) 326 IAC 2-7-4 or 326 IAC 2-7-8; and

    (ii) 326 IAC 2-7-10.5(g).

    (3) Seven thousand five hundred dollars ($7,500) for the following permits that are subject to PSD under 326 IAC 2-2, or emission offsets under 326 IAC 2-3 or section 5 of this rule:

    (A) Construction permit under 326 IAC 2-5.1.

    (B) Significant source modification under 326 IAC 2-7-10.5(g).

    (C) Permit renewal with significant source modification under:

    (i) 326 IAC 2-7-4 or 326 IAC 2-7-8; and

    (ii) 326 IAC 2-7-10.5(g).

    (4) Except for a municipal solid waste incinerator with capacity greater than two hundred fifty (250) tons per day, Part 70 annual fees as follows:

    (A) A base fee of one thousand eight hundred seventy-five dollars ($1,875) and an additional fee of forty-one dollars and twenty-five cents ($41.25) per ton for each ton of regulated air pollutant emitted, to be limited to not more than:

    (i) one hundred eighty-seven thousand five hundred dollars ($187,500); or

    (ii) two hundred fifty thousand dollars ($250,000), if a source:

    (AA) emits more than one hundred (100) tons per year of NOx;

    (BB) emits more than one hundred (100) tons per year of VOC; and

    (CC) is located in an area designated as serious or severe nonattainment for ozone in accordance with the CAA.

    (B) The annual fee calculation in clause (A) shall exclude the following:

    (i) The amount of a Part 70 source's actual annual emission of each regulated air pollutant that the source emits in excess of four thousand (4,000) tons per year.

    (ii) Emissions for which a fee is due in accordance with this section, except from coke plants subject to 40 CFR 63, Subpart L*.

    (5) Fees for establishing a plantwide applicability limitation (PAL) are as follows:

    (A) A separate fee shall be assessed for each PAL pollutant.

    (B) The fee for each PAL pollutant shall be fifty dollars ($50) per ton of the allowable emissions for that PAL pollutant.

    (C) The maximum combined fee for all PAL pollutants shall not exceed fifty thousand dollars ($50,000).

      (e) A source that applies for a FESOP under 326 IAC 2-8, except FESOP general permit sources under 326 IAC 2-8-18, shall submit the following fees, as applicable:

    (1) Three thousand seven hundred fifty dollars ($3,750) for an initial FESOP under 326 IAC 2-8-3.

    (2) Six hundred twenty-five dollars ($625) for the following:

    (A) Minor permit revision under 326 IAC 2-8-11.1(d).

    (B) Permit renewal with minor permit revision under:

    (i) 326 IAC 2-8-3 or 326 IAC 2-8-7; and

    (ii) 326 IAC 2-8-11.1(d).

    (3) Four thousand three hundred seventy-five dollars ($4,375) for the following permits that are not subject to PSD under 326 IAC 2-2, or emission offsets under 326 IAC 2-3 or section 5 of this rule:

    (A) Construction permit under 326 IAC 2-5.1.

    (B) Significant permit revision under 326 IAC 2-8-11.1(f) or 326 IAC 2-8-11.1(g).

    (C) Permit renewal with significant permit revision under:

    (i) 326 IAC 2-8-3 or 326 IAC 2-8-7; and

    (ii) 326 IAC 2-8-11.1(f) or 326 IAC 2-8-11.1(g).

    (4) Seven thousand five hundred dollars ($7,500) for the following permits that are subject to PSD under 326 IAC 2-2, or emission offsets under 326 IAC 2-3 or section 5 of this rule:

    (A) Construction permit under 326 IAC 2-5.1.

    (B) Significant permit revision under 326 IAC 2-8-11.1(f) or 326 IAC 2-8-11.1(g).

    (C) Permit renewal with significant permit revision under:

    (i) 326 IAC 2-8-3 or 326 IAC 2-8-7; and

    (ii) 326 IAC 2-8-11.1(f) or 326 IAC 2-8-11.1(g).

    (5) An annual fee of one thousand eight hundred seventy-five dollars ($1,875) under 326 IAC 2-8-16(b).

    (6) Fees for establishing a PAL are as follows:

    (A) A separate fee shall be assessed for each PAL pollutant.

    (B) The fee for each PAL pollutant shall be fifty dollars ($50) per ton of the allowable emissions for that PAL pollutant.

    (C) The maximum combined fee for all PAL pollutants shall not exceed fifty thousand dollars ($50,000).

      (f) A source that applies for a FESOP general permit under 326 IAC 2-8-18 shall submit the following fees, as applicable:

    (1) An application fee of six hundred twenty-five dollars ($625) under 326 IAC 2-8-18.

    (2) An annual fee of one thousand two hundred fifty dollars ($1,250) under 326 IAC 2-8-18.

      (g) A source that applies for a SSOA under 326 IAC 2-9 shall submit the following fees, as applicable:

    (1) Four thousand three hundred seventy-five dollars ($4,375) for a construction permit under 326 IAC 2-5.1.

    (2) For an existing source, for up to four (4) SSOAs on the same application, an application fee of six hundred twenty-five dollars ($625) under 326 IAC 2-9 as follows:

    (A) Industrial or commercial surface coatings under 326 IAC 2-9-2.5.

    (B) Surface coating or graphic arts operations under 326 IAC 2-9-3.

    (C) Woodworking operations under 326 IAC 2-9-4.

    (D) Abrasive cleaning operations under 326 IAC 2-9-5.

    (E) Grain elevators under 326 IAC 2-9-6.

    (F) Sand and gravel plants under 326 IAC 2-9-7.

    (G) Crushed stone processing plants under 326 IAC 2-9-8.

    (H) Ready-mix concrete batch plants under 326 IAC 2-9-9.

    (I) Coal mines and coal preparation plants under 326 IAC 2-9-10.

    (J) Automobile refinishing operations under 326 IAC 2-9-11.

    (K) Degreasing operations under 326 IAC 2-9-12.

    (L) External combustion sources 326 IAC 2-9-13.

    (M) Internal combustion sources 326 IAC 2-9-14.

    (3) An annual fee of one thousand dollars ($1,000) for crushed stone processing plants under 326 IAC 2-9-8(b)(3).

    (4) An annual fee of seven hundred fifty dollars ($750) for coal mines and coal preparation plants under 326 IAC 2-9-10.

      (h) A source that applies for an MSOP under 326 IAC 2-6.1 shall submit the following fees, as applicable:

    (1) One hundred dollars ($100) for an initial MSOP under 326 IAC 2-6.1.

    (2) Six hundred dollars ($600) for the following:

    (A) Minor permit revision under 326 IAC 2-6.1-6(g).

    (B) Permit renewal with minor permit revision under 326 IAC 2-6.1-7 and 326 IAC 2-6.1-6(g).

    (3) One hundred dollars ($100) for an MSOP renewal under 326 IAC 2-6.1-7.

    (4) Three thousand five hundred dollars ($3,500) for the following permits that are not subject to PSD under 326 IAC 2-2, or emission offsets under 326 IAC 2-3 or section 5 of this rule:

    (A) Construction permit under 326 IAC 2-5.1.

    (B) Significant permit revision under 326 IAC 2-6.1-6(i).

    (C) Permit renewal with significant permit revision under 326 IAC 2-6.1-7 and 326 IAC 2-6.1-6(i).

    (5) Six thousand dollars ($6,000) for the following permits that are subject to PSD under 326 IAC 2-2, or emission offsets under 326 IAC 2-3 or section 5 of this rule:

    (A) Construction permit under 326 IAC 2-5.1.

    (B) Significant permit revision under 326 IAC 2-6.1-6(i).

    (C) Permit renewal with significant permit revision under 326 IAC 2-6.1-7 and 326 IAC 2-6.1-6(i).

    (6) An annual operating fee of two hundred dollars ($200) under 326 IAC 2-6.1.

    (7) Fees for establishing a PAL are as follows:

    (A) A separate fee shall be assessed for each PAL pollutant.

    (B) The fee for each PAL pollutant shall be forty dollars ($40) per ton of the allowable emissions for that PAL pollutant.

    (C) The maximum combined fee for all PAL pollutants shall not exceed forty thousand dollars ($40,000).

      (i) Applicable transition fees shall be submitted as follows:

    (1) One thousand two hundred fifty dollars ($1,250) for a transition from a Part 70 permit to a FESOP.

    (2) Except for a transition under subdivision (1), a transition fee shall be the fee associated with the registration, operating agreement, or type of permit for which an application has been submitted to the department.

      (j) Sources required to have a registration under 326 IAC 2-5.1-2 or 326 IAC 2-5.5 shall submit a fee of six hundred dollars ($600).

      (k) General permit sources under 326 IAC 2-12 shall submit a fee of six hundred twenty-five dollars ($625).

      (l) Sources seeking an interim permit approval under 326 IAC 2-13-1 shall submit a fee as follows:

    (1) Title V, FESOP, and SSOA sources shall submit six hundred twenty-five dollars ($625) with the application for an interim permit approval.

    (2) MSOP, registration, or exempt sources shall submit five hundred dollars ($500) with the application for an interim permit approval.

    (3) The fee shall be paid by:

    (A) mail or in person; and

    (B) check or money order, payable to "Cashier, Indiana Department of Environmental Management" at the time of application.

    Nonpayment may result in denial of a permit application or revocation of the permit.

      (m) Title V, FESOP, and SSOA sources subject to this article shall submit other applicable fees identified on the bill as follows:

    (1) Fees for air quality analyses are as follows:

    (A) A fee of four thousand three hundred seventy-five dollars ($4,375) shall be submitted if an air quality analysis is required under 326 IAC 2-2-5 or 326 IAC 2-3-3.

    (B) In lieu of the fee under clause (A), a fee of seven thousand five hundred dollars ($7,500) shall be submitted for an air quality analysis per pollutant performed by the department upon request of the source owner or operator. The commissioner may deny a request to perform an air quality analysis.

    (2) Fees for control technology analyses for best available control technology (BACT) under 326 IAC 2-2-3 or lowest achievable emission rate (LAER) under 326 IAC 2-3-3 are as follows per pollutant and per emissions unit or group of identical emissions units for which a control technology analysis is required:

    (A) A fee of three thousand seven hundred fifty dollars ($3,750) shall be submitted if two (2) to five (5) control technology analyses are required.

    (B) A fee of seven thousand five hundred dollars ($7,500) shall be submitted if six (6) to ten (10) control technology analyses are required.

    (C) A fee of twelve thousand five hundred dollars ($12,500) shall be submitted if more than ten (10) control technology analyses are required.

    (3) A fee of six hundred twenty-five dollars ($625) shall be submitted for each review for an applicable:

    (A) national emission standard for hazardous air pollutants under:

    (i) 326 IAC 14;

    (ii) 326 IAC 20;

    (iii) 40 CFR 61; or

    (iv) 40 CFR 63; or

    (B) new source performance standard under:

    (i) 326 IAC 12; or

    (ii) 40 CFR 60.

    (4) A fee of six hundred twenty-five dollars ($625) shall be submitted for each public hearing conducted prior to issuance of the permit, permit modification, or permit revision approval.

    (5) A fee of seven hundred fifty dollars ($750) shall be submitted for each control technology analysis for BACT for volatile organic compounds under 326 IAC 8-1-6 and for maximum achievable control technology under 326 IAC 2-4.1.

    (6) A fee of one hundred twenty-five dollars ($125) shall be submitted for each experimental trial approval under section 3(h)(3) of this rule.

    (7) Except for Part 70 and FESOP sources, a fee of one hundred twenty-five dollars ($125) shall be submitted for each relocation approval for a portable source under 326 IAC 2-14.

    (8) Except for Part 70 and FESOP sources, a fee of eight hundred seventy-five dollars ($875) shall be submitted for a review under 326 IAC 3 of any source sampling test required by permit, per emissions unit. This fee shall be paid upon submittal of a protocol for the stack test as required by 326 IAC 3.

      (n) MSOP, registration, or exempt sources subject to this article shall submit other applicable fees identified on the bill as follows:

    (1) A fee of one hundred dollars ($100) for an exemption under section 3 of this rule or 326 IAC 2-5.1-1(1).

    (2) Fees for air quality analyses are as follows:

    (A) A fee of three thousand five hundred dollars ($3,500) shall be submitted if an air quality analysis is required under 326 IAC 2-2-5 or 326 IAC 2-3-3.

    (B) In lieu of the fee under clause (A), a fee of six thousand dollars ($6,000) shall be submitted for an air quality analysis per pollutant performed by the department upon request of the source owner or operator. The commissioner may deny a request to perform an air quality analysis.

    (3) Fees for control technology analyses for BACT under 326 IAC 2-2-3 or LAER under 326 IAC 2-3-3 are as follows per pollutant and per emissions unit or group of identical emissions units for which a control technology analysis is required:

    (A) A fee of three thousand dollars ($3,000) shall be submitted if two (2) to five (5) control technology analyses are required.

    (B) A fee of six thousand dollars ($6,000) shall be submitted if six (6) to ten (10) control technology analyses are required.

    (C) A fee of ten thousand dollars ($10,000) shall be submitted if more than ten (10) control technology analyses are required.

    (4) A fee of five hundred dollars ($500) shall be submitted for each review for an applicable:

    (A) national emission standard for hazardous air pollutants under:

    (i) 326 IAC 14;

    (ii) 326 IAC 20;

    (iii) 40 CFR 61; or

    (iv) 40 CFR 63; or

    (B) new source performance standard under:

    (i) 326 IAC 12; or

    (ii) 40 CFR 60.

    (5) A fee of five hundred dollars ($500) shall be submitted for each public hearing conducted prior to issuance of the permit or revision approval.

    (6) A fee of six hundred dollars ($600) shall be submitted for each control technology analysis for BACT for volatile organic compounds under 326 IAC 8-1-6 and for maximum achievable control technology under 326 IAC 2-4.1.

    (7) A fee of one hundred dollars ($100) shall be submitted for each experimental trial approval under section 3(h)(3) of this rule.

    (8) A fee of one hundred dollars ($100) shall be submitted for each relocation approval for a portable source under 326 IAC 2-14.

    (9) A fee of seven hundred dollars ($700) shall be submitted for review under 326 IAC 3 of any source sampling test required by permit, per emissions unit. This fee shall be paid upon submittal of a protocol for the stack test as required by 326 IAC 3.

      (o) Other annual operating permit fees shall be assessed for identified source categories as follows:

    (1) In addition to the applicable fees in this section, a fee for each coke plant equal to the costs to the commissioner associated with conducting the surveillance activities required to determine compliance with 40 CFR Part 63, Subpart L* shall be submitted. Any fee collected under this subdivision shall not exceed one hundred fifty-six thousand two hundred fifty dollars ($156,250).

    (2) A fee of twenty-five thousand dollars ($25,000) shall be submitted for a municipal solid waste incinerator with capacity greater than two hundred fifty (250) tons per day.

      (p) The following table is provided as a reference to the fees described in this section:

    DESCRIPTION

    FEE

    REFERENCE

    Part 70 Fees

     

    Minor Source Modification

    $625

    326 IAC 2-7-10.5(e)

     

    Renewal with Minor Source Modification

    $625

    326 IAC 2-7-4, 326 IAC 2-7-8, 326 IAC 2-7-10.5(e)

     

    Construction Permit

    $4,375

    326 IAC 2-5.1

     

    Construction Permit with PSD or Emission Offset

    $7,500

    326 IAC 2-1.1-5, 326 IAC 2-2, 326 IAC 2-3, 326 IAC 2-5.1

     

    Significant Source Modification

    $4,375

    326 IAC 2-7-10.5(g)

     

    Significant Source Modification with PSD or Emission Offset

    $7,500

    326 IAC 2-1.1-5, 326 IAC 2-2, 326 IAC 2-3, 326 IAC 2-7-10.5(g)

     

    Renewal with Significant Source Modification

    $4,375

    326 IAC 2-7-4, 326 IAC 2-7-8, 326 IAC 2-7-10.5(g)

     

    Renewal with Significant Source Modification and PSD or Emission Offset

    $7,500

    326 IAC 2-1.1-5, 326 IAC 2-2, 326 IAC 2-3, 326 IAC 2-7-4, 326 IAC 2-7-8, 326 IAC 2-7-10.5(g)

     

    PAL (Separate fee per PAL pollutant. Maximum combined fee for all PAL pollutants not to exceed $50,000.)

    $50 per ton of allowable emissions

    326 IAC 2-2.4, 326 IAC 2-3.4

    FESOP Fees

     

    Initial FESOP

    $3,750

    326 IAC 2-8-3

     

    Minor Permit Revision

    $625

    326 IAC 2-8-11.1(d)

     

    Renewal with Minor Permit Revision

    $625

    326 IAC 2-8-3, 326 IAC 2-8-7, 326 IAC 2-8-11.1(d)

     

    Construction Permit

    $4,375

    326 IAC 2-5.1

     

    Construction Permit with PSD or Emission Offset

    $7,500

    326 IAC 2-1.1-5, 326 IAC 2-2, 326 IAC 2-3, 326 IAC 2-5.1

     

    Significant Permit Revision

    $4,375

    326 IAC 2-8-11.1(f), 326 IAC 2-8-11.1(g)

     

    Significant Permit Revision with PSD or Emission Offset

    $7,500

    326 IAC 2-1.1-5, 326 IAC 2-2, 326 IAC 2-3, 326 IAC 2-8-11.1(f), 326 IAC 2-8-11.1(g)

     

    Renewal with Significant Permit Revision

    $4,375

    326 IAC 2-8-3, 326 IAC 2-8-7, 326 IAC 2-8-11.1(f), 326 IAC 2-8-11.1(g)

     

    Renewal with Significant Permit Revision and PSD or Emission Offset

    $7,500

    326 IAC 2-1.1-5, 326 IAC 2-2, 326 IAC 2-3, 326 IAC 2-8-3, 326 IAC 2-8-7, 326 IAC 2-8-11.1(f), 326 IAC 2-8-11.1(g)

     

    PAL (Separate fee per PAL pollutant. Maximum combined fee for all PAL pollutants not to exceed $50,000.)

    $50 per ton of allowable emissions

    326 IAC 2-2.4, 326 IAC 2-3.4

     

    FESOP general permit

    $625

    326 IAC 2-8-18

    SSOA Fees

     

    Construction Permit

    $4,375

    326 IAC 2-5.1, 326 IAC 2-9

     

    Industrial or Commercial Surface Coatings

    $625

    326 IAC 2-9-2.5

     

    Surface Coating or Graphic Arts Operations

    $625

    326 IAC 2-9-3

     

    Woodworking Operations

    $625

    326 IAC 2-9-4

     

    Abrasive Cleaning Operations

    $625

    326 IAC 2-9-5

     

    Grain Elevators

    $625

    326 IAC 2-9-6

     

    Sand and Gravel Plants

    $625

    326 IAC 2-9-7

     

    Crushed Stone Processing Plants

    $625

    326 IAC 2-9-8

     

    Ready-mix Concrete Batch Plants

    $625

    326 IAC 2-9-9

     

    Coal Mines and Coal Preparation Plants

    $625

    326 IAC 2-9-10

     

    Automobile Refinishing Operations

    $625

    326 IAC 2-9-11

     

    Degreasing Operations

    $625

    326 IAC 2-9-12

     

    External Combustion Sources

    $625

    326 IAC 2-9-13

     

    Internal Combustion Sources

    $625

    326 IAC 2-9-14

     

    A source may apply for up to four SSOAs on a single SSOA application and the fee will be $625 for the application.

    Transition Fees

     

    Transition from Part 70 Permit to FESOP

    $1,250

    326 IAC 2-1.1-7.5

     

    All other transition fees shall be the fee associated with the registration, operating agreement, or type of permit for which an application has been submitted to the department in accordance with 326 IAC 2-1.1-7.5.

    MSOP Fees

     

    Initial MSOP

    $100

    326 IAC 2-6.1

     

    Minor Permit Revision

    $600

    326 IAC 2-6.1-6(g)

     

    Renewal with Minor Permit Revision

    $600

    326 IAC 2-6.1-7, 326 IAC 2-6.1-6(g)

     

    Renewal

    $100

    326 IAC 2-6.1-7

     

    Construction Permit

    $3,500

    326 IAC 2-5.1

     

    Construction Permit with PSD or Emission Offset

    $6,000

    326 IAC 2-1.1-5 326 IAC 2-2, 326 IAC 2-3, 326 IAC 2-5.1

     

    Significant Permit Revision (no PSD or Emission Offset)

    $3,500

    326 IAC 2-6.1-6(i)

     

    Significant Permit Revision with PSD or Emission Offset

    $6,000

    326 IAC 2-1.1-5, 326 IAC 2-2, 326 IAC 2-3, 326 IAC 2-6.1-6(i)

     

    Renewal with Significant Permit Revision

    $3,500

    326 IAC 2-6.1-7, 326 IAC 2-6.1-6(i)

     

    Renewal with Significant Permit Revision and PSD or Emission Offset

    $6,000

    326 IAC 2-1.1-5, 326 IAC 2-2, 326 IAC 2-3, 326 IAC 2-6.1-7, 326 IAC 2-6.1-6(i)

     

    PAL (Separate fee per PAL pollutant. Maximum combined fee for all PAL pollutants not to exceed $40,000.)

    $40 per ton of allowable emissions

    326 IAC 2-2.4, 326 IAC 2-3.4

    Registration

    $600

    326 IAC 2-5.1-2, 326 IAC 2-5.5

    General Permit

    $625

    326 IAC 2-12

    Other Fees

     

    Exemption (Exempt Source)

    $100

    326 IAC 2-1.1-3, 326 IAC 2-5.1-1(1)

     

    Relocation of a Portable Source (SSOA Source)

    $125

    326 IAC 2-14

     

    Relocation of a Portable Source (MSOP, Registration or Exempt Source)

    $100

    326 IAC 2-14

     

    Interim Permit (Title V, FESOP, or SSOA Source)

    $625

    326 IAC 2-13-1

     

    Interim Permit (MSOP, Registration, or Exempt Source)

    $500

    326 IAC 2-13-1

     

    Public Hearing (Title V, FESOP, or SSOA Source)

    $625

    326 IAC 2-7, 326 IAC 2-8, 326 IAC 2-9

     

    Public Hearing (MSOP, Registration, or Exempt Source)

    $500

    326 IAC 2-1.1-3, 326 IAC 2-5.5, 326 IAC 2-6.1

     

    NSPS Review (Title V, FESOP, or SSOA Source)

    $625 each

    326 IAC 12-1, 40 CFR 60

     

    NSPS Review (MSOP, Registration, or Exempt Source)

    $500 each

    326 IAC 12-1, 40 CFR 60

     

    NESHAP Review (Title V, FESOP, or SSOA Source)

    $625 each

    326 IAC 14, 326 IAC 20, 40 CFR 61, 40 CFR 63

     

    NESHAP Review (MSOP, Registration, or Exempt Source)

    $500 each

    326 IAC 14, 326 IAC 20, 40 CFR 61, 40 CFR 63

     

    VOC BACT or MACT Review (Title V, FESOP, or SSOA Source)

    $750 each

    326 IAC 8-1-6, 326 IAC 2-4.1

     

    VOC BACT or MACT Review (MSOP, Registration, or Exempt Source)

    $600 each

    326 IAC 8-1-6, 326 IAC 2-4.1

    PSD BACT or LAER Review

     

    2 to 5 Review Analyses (Title V, FESOP, or SSOA source)

    $3,750

    326 IAC 2-2-3, 326 IAC 2-3-3

     

    6 to 10 Review Analyses (Title V, FESOP, or SSOA source)

    $7,500

    326 IAC 2-2-3, 326 IAC 2-3-3

     

    11 or More Review Analyses (Title V, FESOP, or SSOA Source)

    $12,500

    326 IAC 2-2-3, 326 IAC 2-3-3

     

    2 to 5 Review Analyses (MSOP, Registration, or Exempt Source)

    $3,000

    326 IAC 2-2-3, 326 IAC 2-3-3

     

    6 to 10 Review Analyses (MSOP, Registration, or Exempt Source)

    $6,000

    326 IAC 2-2-3, 326 IAC 2-3-3

     

    11 or More Review Analyses (MSOP, Registration, or Exempt Source)

    $10,000

    326 IAC 2-2-3, 326 IAC 2-3-3

    Air Quality Impact Study Review

     

    If Applicant Does Analysis (Title V, FESOP, or SSOA Source)

    $4,375

    326 IAC 2-2-5, 326 IAC 2-3-3

     

    If Applicant Does Analysis (MSOP, Registration, or Exempt Source)

    $3,500

    326 IAC 2-2-5, 326 IAC 2-3-3

     

    If OAQ Does Analysis (Title V, FESOP, or SSOA Source)

    $7,500 per pollutant

    326 IAC 2-2-5, 326 IAC 2-3-3

     

    If OAQ Does Analysis (MSOP, Registration, or Exempt Source)

    $6,000 per pollutant

    326 IAC 2-2-5, 326 IAC 2-3-3

    Experimental Trial Approval (Title V, FESOP, or SSOA Source)

    $125

    326 IAC 2-1.1-3(h)(3)

    Experimental Trial Approval (MSOP, Registration, or Exempt Source)

    $100

    326 IAC 2-1.1-3(h)(3)

    Source Sampling Test (SSOA Source)

    $875

    326 IAC 3

    Source Sampling Test (MSOP, Registration, or Exempt Source)

    $700

    326 IAC 3

    Annual Fees

     

    Part 70; Limited to $187,500 per year or, for sources emitting more than 100 tons NOx per year and more than 100 tons; VOC per year and in serious or severe ozone nonattainment area, $250,000. (Or up to 4,000 tons per year for each pollutant)

    $1,875 plus $41.25 per ton for each regulated air pollutant

    326 IAC 2-7

     

    FESOP Annual Fee

    $1,875

    326 IAC 2-8-16(b)

     

    FESOP General Permit Annual Fee

    $1,250

    326 IAC 2-8-18

     

    SSOA Crushed Stone Processing Plants, Annual

    $1,000

    326 IAC 2-9-8(b)(3)

     

    SSOA Coal Mines and Coal Preparation Plants, Annual

    $750

    326 IAC 2-9-10

     

    MSOP Annual Fee

    $200

    326 IAC 2-6.1

    Other Annual Fees

     

    Monitoring Coke Oven Batteries

    up to $156,250

     

     

    Municipal Solid Waste Incinerator

    $25,000

    326 IAC 2-7-19(c)

    In any conflict between subsections (a) through (o) and this table, a source shall comply with the provisions in subsections (a) through (o).

      *This document is incorporated by reference. Copies may be obtained from the Government Printing Office, 732 North Capitol Street NW, Washington, D.C. 20401 or are available for review and copying at the Indiana Department of Environmental Management, Office of Air Quality, Indiana Government Center North, Tenth Floor, 100 North Senate Avenue, Indianapolis, Indiana 46204. (Air Pollution Control Division; 326 IAC 2-1.1-7; filed Nov 25, 1998, 12:13 p.m.: 22 IR 991; filed May 21, 2002, 10:20 a.m.: 25 IR 3057; filed Aug 10, 2004, 3:35 p.m.: 27 IR 3887; filed Sep 28, 2011, 10:56 a.m.: 20111026-IR-326070286FRA; errata filed Jan 2, 2013, 2:19 p.m.: 20130123-IR-326130002ACA)