Indiana Administrative Code (Last Updated: December 20, 2016) |
Title 312. NATURAL RESOURCES COMMISSION |
Article 312IAC25. COAL MINING AND RECLAMATION OPERATIONS |
Rule 312IAC25-6. Performance Standards |
Section 312IAC25-6-1. Coal exploration; applicability |
Section 312IAC25-6-2. Coal exploration; required documents |
Section 312IAC25-6-3. Coal exploration; performance standards |
Section 312IAC25-6-4. Coal exploration; permit requirements |
Section 312IAC25-6-5. Surface mining; applicability |
Section 312IAC25-6-6. Surface mining; signs and markers |
Section 312IAC25-6-7. Surface mining; coal recovery |
Section 312IAC25-6-8. Surface mining; casing and sealing drilled holes; general requirements |
Section 312IAC25-6-9. Surface mining; casing and sealing drilled holes; temporary |
Section 312IAC25-6-10. Surface mining; casing and sealing drilled holes; permanent |
Section 312IAC25-6-11. Surface mining; topsoil and subsoil |
Section 312IAC25-6-12. Hydrologic balance; general requirements |
Section 312IAC25-6-13. Surface mining; hydrologic balance; water quality standards and effluent limitations |
Section 312IAC25-6-14. Hydrologic balance; diversion; general requirements |
Section 312IAC25-6-15. Hydrologic balance; diversions of perennial streams, intermittent streams, miscellaneous flows; supplemental requirements |
Section 312IAC25-6-16. Surface mining; hydrologic balance; sediment control measures |
Section 312IAC25-6-17. Surface mining; hydrologic balance; siltation structures |
Section 312IAC25-6-18. Hydrologic balance; discharge structures |
Section 312IAC25-6-19. Hydrologic balance; acid-forming and toxic-forming spoil |
Section 312IAC25-6-20. Surface mining; hydrologic balance; permanent and temporary impoundments |
Section 312IAC25-6-21. Hydrologic balance; ground water protection |
Section 312IAC25-6-22. Hydrologic balance; ground water recharge capacity protection |
Section 312IAC25-6-23. Surface mining; hydrologic balance; surface and ground water monitoring |
Section 312IAC25-6-24. Hydrologic balance; transfer of wells |
Section 312IAC25-6-25. Hydrologic balance; water rights and replacement |
Section 312IAC25-6-26. Hydrologic balance; water discharge into underground mine |
Section 312IAC25-6-27. Surface mining; hydrologic balance; siltation structures postmining rehabilitation; diversions, impoundments, and treatment facilities |
Section 312IAC25-6-28. Surface mining; hydrologic balance; stream buffer zone |
Section 312IAC25-6-29. Surface mining; explosives; general requirements |
Section 312IAC25-6-30. Surface mining; explosives; preblasting survey |
Section 312IAC25-6-31. Surface mining; explosives; publication of blasting schedule |
Section 312IAC25-6-32. Surface mining; explosives; blasting operations |
Section 312IAC25-6-33. Surface mining; explosives; records of blasting operations |
Section 312IAC25-6-34. Surface mining; disposal of excess spoil |
Section 312IAC25-6-35. Surface mining; protection of underground mines |
Section 312IAC25-6-36. Surface mining; coal mine waste; general requirements |
Section 312IAC25-6-37. Surface mining; coal mine waste; refuse piles; site inspection |
Section 312IAC25-6-38. Coal processing waste; refuse piles; water control measures |
Section 312IAC25-6-39. Surface mining; coal mine waste; refuse piles; construction requirements |
Section 312IAC25-6-40. Coal processing waste; burning |
Section 312IAC25-6-41. Coal processing waste; return to underground workings |
Section 312IAC25-6-42. Disposal of noncoal wastes |
Section 312IAC25-6-43. Surface mining; coal mine waste; dams and embankments; general requirements |
Section 312IAC25-6-44. Coal processing waste; dams and embankments; site preparation |
Section 312IAC25-6-45. Surface mining; coal mine waste; dams and embankments; design and construction |
Section 312IAC25-6-46. Surface mining; protection of fish, wildlife, and related environmental values |
Section 312IAC25-6-47. Surface mining; slides and other damage |
Section 312IAC25-6-48. Surface mining; contemporaneous reclamation |
Section 312IAC25-6-49. Surface mining; backfilling and grading; timing limitations |
Section 312IAC25-6-50. Surface mining; backfilling and grading; general requirements |
Section 312IAC25-6-51. Surface mining; stabilization of surface areas |
Section 312IAC25-6-52. Surface mining; backfilling and grading; thick overburden |
Section 312IAC25-6-53. Surface mining; backfilling and grading; previously mined areas |
Section 312IAC25-6-54. Surface mining; revegetation; general requirements |
Section 312IAC25-6-55. Surface mining; revegetation; use of introduced species |
Section 312IAC25-6-56. Surface mining; revegetation; timing |
Section 312IAC25-6-57. Surface mining; revegetation; mulching and other soil stabilizing practices |
Section 312IAC25-6-58. Surface mining; revegetation; grazing |
Section 312IAC25-6-59. Surface mining; revegetation; standards for success for nonprime farmland |
Section 312IAC25-6-60. Revegetation; sampling techniques for nonprime farmland |
Section 312IAC25-6-61. Revegetation; statistical methodology |
Section 312IAC25-6-62. Cessation of operations; temporary |
Section 312IAC25-6-63. Cessation of operations; permanent |
Section 312IAC25-6-64. Postmining land use |
Section 312IAC25-6-65. Surface mining; roads |
Section 312IAC25-6-66. Surface mining; primary roads |
Section 312IAC25-6-67. Surface mining; other transportation facilities |
Section 312IAC25-6-68. Support facilities and utility installations |
Section 312IAC25-6-69. Surveyor corner markers; replacement |
Section 312IAC25-6-70. Underground mining; applicability |
Section 312IAC25-6-71. Underground mining; signs and markers |
Section 312IAC25-6-72. Underground mining; casing and sealing exposed underground openings; general requirements |
Section 312IAC25-6-73. Underground mining; casing and sealing exposed underground openings; temporary |
Section 312IAC25-6-74. Underground mining; casing and sealing exposed underground openings; permanent |
Section 312IAC25-6-75. Underground mining; topsoil and subsoil |
Section 312IAC25-6-76. Underground mining; hydrologic balance; general requirements |
Section 312IAC25-6-77. Underground mining; hydrologic balance; water quality standards and effluent limitations |
Section 312IAC25-6-78. Underground mining; hydrologic balance; diversions; general requirements |
Section 312IAC25-6-80. Underground mining; hydrologic balance; sediment control measures |
Section 312IAC25-6-81. Underground mining; hydrologic balance; siltation structures |
Section 312IAC25-6-82. Underground mining; hydrologic balance; discharge structures |
Section 312IAC25-6-83. Underground mining; hydrologic balance; acid-forming and toxic-forming materials |
Section 312IAC25-6-84. Underground mining; hydrologic balance; permanent and temporary impoundments |
Section 312IAC25-6-85. Underground mining; hydrologic balance; underground mine entry and access discharges |
Section 312IAC25-6-86. Underground mining; hydrologic balance; surface and ground water monitoring |
Section 312IAC25-6-87. Underground mining; hydrologic balance; transfer of wells |
Section 312IAC25-6-88. Underground mining; hydrologic balance; water rights and replacement |
Section 312IAC25-6-89. Underground mining; hydrologic balance; discharge of water into underground mine |
Section 312IAC25-6-90. Underground mining; hydrologic balance; postmining rehabilitation of siltation structures, diversions, impoundments, and treatment facilities |
Section 312IAC25-6-91. Underground mining; hydrologic balance; stream buffer zones |
Section 312IAC25-6-92. Underground mining; coal recovery |
Section 312IAC25-6-93. Underground mining; explosives; general requirements |
Section 312IAC25-6-94. Underground mining; explosives; preblasting survey |
Section 312IAC25-6-95. Underground mining; explosives; publication of blasting schedule |
Section 312IAC25-6-96. Underground mining; explosives; surface blasting operations |
Section 312IAC25-6-97. Underground mining; explosives; records of blasting operations |
Section 312IAC25-6-98. Underground mining; disposal of underground development waste and excess spoil |
Section 312IAC25-6-99. Underground mining; coal mine waste; general requirements |
Section 312IAC25-6-100. Underground mining; coal mine waste; refuse piles; site inspection |
Section 312IAC25-6-101. Underground mining; coal mine waste banks; refuse piles; water control measures |
Section 312IAC25-6-102. Underground mining; coal mine waste; refuse piles; construction requirements |
Section 312IAC25-6-103. Underground mining; coal processing waste; burning |
Section 312IAC25-6-104. Underground mining; coal processing waste; return to underground workings |
Section 312IAC25-6-105. Underground mining; disposal of noncoal wastes |
Section 312IAC25-6-106. Underground mining; coal mine waste; refuse piles; dams and embankments; general requirements |
Section 312IAC25-6-107. Underground mining; coal processing waste; dams and embankments; site preparation |
Section 312IAC25-6-108. Underground mining; coal mine waste; refuse piles; dams and embankments; design and construction |
Section 312IAC25-6-109. Underground mining; protection of fish, wildlife, and related environmental values |
Section 312IAC25-6-110. Underground mining; slides and other damage |
Section 312IAC25-6-111. Underground mining; contemporaneous reclamation |
Section 312IAC25-6-112. Underground mining; backfilling and grading; general requirements |
Section 312IAC25-6-113. Underground mining; stabilization of surface areas |
Section 312IAC25-6-114. Underground mining; backfilling and grading; previously mined areas |
Section 312IAC25-6-115. Underground mining; revegetation; general requirements |
Section 312IAC25-6-116. Underground mining; revegetation; use of introduced species |
Section 312IAC25-6-117. Underground mining; revegetation; timing |
Section 312IAC25-6-118. Underground mining; revegetation; mulching and soil stabilizing |
Section 312IAC25-6-119. Underground mining; revegetation; grazing |
Section 312IAC25-6-120. Underground mining; revegetation; standards for success for nonprime farmland |
Section 312IAC25-6-121. Underground mining; revegetation; sampling techniques |
Section 312IAC25-6-122. Underground mining; revegetation; statistical methodology |
Section 312IAC25-6-123. Underground mining; subsidence control; general requirements |
Section 312IAC25-6-124. Underground mining; subsidence control; public notice |
Section 312IAC25-6-125. Underground mining; subsidence control; buffer zones |
Section 312IAC25-6-126. Underground mining; cessation of operation; temporary |
Section 312IAC25-6-127. Underground mining; cessation of operation; permanent |
Section 312IAC25-6-128. Underground mining; postmining land use |
Section 312IAC25-6-129. Underground mining; roads |
Section 312IAC25-6-130. Underground mining; primary roads |
Section 312IAC25-6-131. Underground mining; other transportation facilities |
Section 312IAC25-6-132. Underground mining; support facilities and utility installations |
Section 312IAC25-6-133. Underground mining; surveyor corner markers; replacement |
Section 312IAC25-6-134. Concurrent surface and underground mining; applicability |
Section 312IAC25-6-135. Concurrent surface and underground mining; compliance with variance terms |
Section 312IAC25-6-136. Concurrent surface and underground mining; additional performance standards |
Section 312IAC25-6-137. Auger mining; special standards; applicability |
Section 312IAC25-6-138. Auger mining; special standards; additional performance standards |
Section 312IAC25-6-139. Prime farmland; special performance standards; scope, purpose, and applicability |
Section 312IAC25-6-140. Prime farmland; special performance standards; United States Soil Conservation Service criteria |
Section 312IAC25-6-141. Prime farmland; special performance standards; soil removal and stockpiling |
Section 312IAC25-6-142. Prime farmland; special performance standards; soil replacement |
Section 312IAC25-6-143. Prime farmland; special performance standards; revegetation and restoration of soil productivity |
Section 312IAC25-6-144. Steep slopes; backfilling and grading |
Section 312IAC25-6-145. Coal preparation plants not within permit area for a mine; permits; applicability |
Section 312IAC25-6-146. Coal preparation plants not within a permit area for a mine; special performance standards |
Section 312IAC25-6-147. In situ processing; special performance standards |
Section 312IAC25-6-148. In situ processing; monitoring |
Section 312IAC25-6-149. Annual report |