Rule 312IAC25-6. Performance Standards  


Section 312IAC25-6-1. Coal exploration; applicability
Section 312IAC25-6-2. Coal exploration; required documents
Section 312IAC25-6-3. Coal exploration; performance standards
Section 312IAC25-6-4. Coal exploration; permit requirements
Section 312IAC25-6-5. Surface mining; applicability
Section 312IAC25-6-6. Surface mining; signs and markers
Section 312IAC25-6-7. Surface mining; coal recovery
Section 312IAC25-6-8. Surface mining; casing and sealing drilled holes; general requirements
Section 312IAC25-6-9. Surface mining; casing and sealing drilled holes; temporary
Section 312IAC25-6-10. Surface mining; casing and sealing drilled holes; permanent
Section 312IAC25-6-11. Surface mining; topsoil and subsoil
Section 312IAC25-6-12. Hydrologic balance; general requirements
Section 312IAC25-6-12.5. Hydrologic balance; application of ground water quality standards at surface coal mining and reclamation operations permitted under IC 14-34 on which coal extraction, including augering, coal processing, coal processing waste disposal, or spoil deposition, occurs after the effective date of this section, or on which disposal activity subject to IC 13-19-3-3 has occurred and the area is not fully released from the performance bond required by IC 14-34-6
Section 312IAC25-6-13. Surface mining; hydrologic balance; water quality standards and effluent limitations
Section 312IAC25-6-14. Hydrologic balance; diversion; general requirements
Section 312IAC25-6-15. Hydrologic balance; diversions of perennial streams, intermittent streams, miscellaneous flows; supplemental requirements
Section 312IAC25-6-16. Surface mining; hydrologic balance; sediment control measures
Section 312IAC25-6-17. Surface mining; hydrologic balance; siltation structures
Section 312IAC25-6-18. Hydrologic balance; discharge structures
Section 312IAC25-6-19. Hydrologic balance; acid-forming and toxic-forming spoil
Section 312IAC25-6-20. Surface mining; hydrologic balance; permanent and temporary impoundments
Section 312IAC25-6-21. Hydrologic balance; ground water protection
Section 312IAC25-6-22. Hydrologic balance; ground water recharge capacity protection
Section 312IAC25-6-23. Surface mining; hydrologic balance; surface and ground water monitoring
Section 312IAC25-6-24. Hydrologic balance; transfer of wells
Section 312IAC25-6-25. Hydrologic balance; water rights and replacement
Section 312IAC25-6-26. Hydrologic balance; water discharge into underground mine
Section 312IAC25-6-27. Surface mining; hydrologic balance; siltation structures postmining rehabilitation; diversions, impoundments, and treatment facilities
Section 312IAC25-6-28. Surface mining; hydrologic balance; stream buffer zone
Section 312IAC25-6-29. Surface mining; explosives; general requirements
Section 312IAC25-6-30. Surface mining; explosives; preblasting survey
Section 312IAC25-6-31. Surface mining; explosives; publication of blasting schedule
Section 312IAC25-6-32. Surface mining; explosives; blasting operations
Section 312IAC25-6-33. Surface mining; explosives; records of blasting operations
Section 312IAC25-6-34. Surface mining; disposal of excess spoil
Section 312IAC25-6-35. Surface mining; protection of underground mines
Section 312IAC25-6-36. Surface mining; coal mine waste; general requirements
Section 312IAC25-6-37. Surface mining; coal mine waste; refuse piles; site inspection
Section 312IAC25-6-38. Coal processing waste; refuse piles; water control measures
Section 312IAC25-6-39. Surface mining; coal mine waste; refuse piles; construction requirements
Section 312IAC25-6-40. Coal processing waste; burning
Section 312IAC25-6-41. Coal processing waste; return to underground workings
Section 312IAC25-6-42. Disposal of noncoal wastes
Section 312IAC25-6-43. Surface mining; coal mine waste; dams and embankments; general requirements
Section 312IAC25-6-44. Coal processing waste; dams and embankments; site preparation
Section 312IAC25-6-45. Surface mining; coal mine waste; dams and embankments; design and construction
Section 312IAC25-6-46. Surface mining; protection of fish, wildlife, and related environmental values
Section 312IAC25-6-47. Surface mining; slides and other damage
Section 312IAC25-6-48. Surface mining; contemporaneous reclamation
Section 312IAC25-6-49. Surface mining; backfilling and grading; timing limitations
Section 312IAC25-6-50. Surface mining; backfilling and grading; general requirements
Section 312IAC25-6-51. Surface mining; stabilization of surface areas
Section 312IAC25-6-52. Surface mining; backfilling and grading; thick overburden
Section 312IAC25-6-53. Surface mining; backfilling and grading; previously mined areas
Section 312IAC25-6-54. Surface mining; revegetation; general requirements
Section 312IAC25-6-55. Surface mining; revegetation; use of introduced species
Section 312IAC25-6-56. Surface mining; revegetation; timing
Section 312IAC25-6-57. Surface mining; revegetation; mulching and other soil stabilizing practices
Section 312IAC25-6-58. Surface mining; revegetation; grazing
Section 312IAC25-6-59. Surface mining; revegetation; standards for success for nonprime farmland
Section 312IAC25-6-60. Revegetation; sampling techniques for nonprime farmland
Section 312IAC25-6-61. Revegetation; statistical methodology
Section 312IAC25-6-62. Cessation of operations; temporary
Section 312IAC25-6-63. Cessation of operations; permanent
Section 312IAC25-6-64. Postmining land use
Section 312IAC25-6-65. Surface mining; roads
Section 312IAC25-6-66. Surface mining; primary roads
Section 312IAC25-6-67. Surface mining; other transportation facilities
Section 312IAC25-6-68. Support facilities and utility installations
Section 312IAC25-6-69. Surveyor corner markers; replacement
Section 312IAC25-6-70. Underground mining; applicability
Section 312IAC25-6-71. Underground mining; signs and markers
Section 312IAC25-6-72. Underground mining; casing and sealing exposed underground openings; general requirements
Section 312IAC25-6-73. Underground mining; casing and sealing exposed underground openings; temporary
Section 312IAC25-6-74. Underground mining; casing and sealing exposed underground openings; permanent
Section 312IAC25-6-75. Underground mining; topsoil and subsoil
Section 312IAC25-6-76. Underground mining; hydrologic balance; general requirements
Section 312IAC25-6-76.5. Underground mining; hydrologic balance; application of ground water quality standards at underground coal mining and reclamation operations permitted under IC 14-34 on which coal extraction, coal processing, coal processing waste disposal, or underground development waste and spoil deposition occurs after the effective date of this section, or on which disposal activity subject to IC 13-19-3-3 has occurred and the area is not fully released from the performance bond required by IC 14-34-6
Section 312IAC25-6-77. Underground mining; hydrologic balance; water quality standards and effluent limitations
Section 312IAC25-6-78. Underground mining; hydrologic balance; diversions; general requirements
Section 312IAC25-6-79. Underground mining; hydrologic balance; diversions of perennial streams, intermittent streams with a watershed greater than one square mile, miscellaneous flows; stream channel diversions; supplemental requirements
Section 312IAC25-6-80. Underground mining; hydrologic balance; sediment control measures
Section 312IAC25-6-81. Underground mining; hydrologic balance; siltation structures
Section 312IAC25-6-82. Underground mining; hydrologic balance; discharge structures
Section 312IAC25-6-83. Underground mining; hydrologic balance; acid-forming and toxic-forming materials
Section 312IAC25-6-84. Underground mining; hydrologic balance; permanent and temporary impoundments
Section 312IAC25-6-85. Underground mining; hydrologic balance; underground mine entry and access discharges
Section 312IAC25-6-86. Underground mining; hydrologic balance; surface and ground water monitoring
Section 312IAC25-6-87. Underground mining; hydrologic balance; transfer of wells
Section 312IAC25-6-88. Underground mining; hydrologic balance; water rights and replacement
Section 312IAC25-6-89. Underground mining; hydrologic balance; discharge of water into underground mine
Section 312IAC25-6-90. Underground mining; hydrologic balance; postmining rehabilitation of siltation structures, diversions, impoundments, and treatment facilities
Section 312IAC25-6-91. Underground mining; hydrologic balance; stream buffer zones
Section 312IAC25-6-92. Underground mining; coal recovery
Section 312IAC25-6-93. Underground mining; explosives; general requirements
Section 312IAC25-6-94. Underground mining; explosives; preblasting survey
Section 312IAC25-6-95. Underground mining; explosives; publication of blasting schedule
Section 312IAC25-6-96. Underground mining; explosives; surface blasting operations
Section 312IAC25-6-97. Underground mining; explosives; records of blasting operations
Section 312IAC25-6-98. Underground mining; disposal of underground development waste and excess spoil
Section 312IAC25-6-99. Underground mining; coal mine waste; general requirements
Section 312IAC25-6-100. Underground mining; coal mine waste; refuse piles; site inspection
Section 312IAC25-6-101. Underground mining; coal mine waste banks; refuse piles; water control measures
Section 312IAC25-6-102. Underground mining; coal mine waste; refuse piles; construction requirements
Section 312IAC25-6-103. Underground mining; coal processing waste; burning
Section 312IAC25-6-104. Underground mining; coal processing waste; return to underground workings
Section 312IAC25-6-105. Underground mining; disposal of noncoal wastes
Section 312IAC25-6-106. Underground mining; coal mine waste; refuse piles; dams and embankments; general requirements
Section 312IAC25-6-107. Underground mining; coal processing waste; dams and embankments; site preparation
Section 312IAC25-6-108. Underground mining; coal mine waste; refuse piles; dams and embankments; design and construction
Section 312IAC25-6-109. Underground mining; protection of fish, wildlife, and related environmental values
Section 312IAC25-6-110. Underground mining; slides and other damage
Section 312IAC25-6-111. Underground mining; contemporaneous reclamation
Section 312IAC25-6-112. Underground mining; backfilling and grading; general requirements
Section 312IAC25-6-113. Underground mining; stabilization of surface areas
Section 312IAC25-6-114. Underground mining; backfilling and grading; previously mined areas
Section 312IAC25-6-115. Underground mining; revegetation; general requirements
Section 312IAC25-6-116. Underground mining; revegetation; use of introduced species
Section 312IAC25-6-117. Underground mining; revegetation; timing
Section 312IAC25-6-118. Underground mining; revegetation; mulching and soil stabilizing
Section 312IAC25-6-119. Underground mining; revegetation; grazing
Section 312IAC25-6-120. Underground mining; revegetation; standards for success for nonprime farmland
Section 312IAC25-6-121. Underground mining; revegetation; sampling techniques
Section 312IAC25-6-122. Underground mining; revegetation; statistical methodology
Section 312IAC25-6-123. Underground mining; subsidence control; general requirements
Section 312IAC25-6-124. Underground mining; subsidence control; public notice
Section 312IAC25-6-125. Underground mining; subsidence control; buffer zones
Section 312IAC25-6-126. Underground mining; cessation of operation; temporary
Section 312IAC25-6-127. Underground mining; cessation of operation; permanent
Section 312IAC25-6-128. Underground mining; postmining land use
Section 312IAC25-6-129. Underground mining; roads
Section 312IAC25-6-130. Underground mining; primary roads
Section 312IAC25-6-131. Underground mining; other transportation facilities
Section 312IAC25-6-132. Underground mining; support facilities and utility installations
Section 312IAC25-6-133. Underground mining; surveyor corner markers; replacement
Section 312IAC25-6-134. Concurrent surface and underground mining; applicability
Section 312IAC25-6-135. Concurrent surface and underground mining; compliance with variance terms
Section 312IAC25-6-136. Concurrent surface and underground mining; additional performance standards
Section 312IAC25-6-137. Auger mining; special standards; applicability
Section 312IAC25-6-138. Auger mining; special standards; additional performance standards
Section 312IAC25-6-139. Prime farmland; special performance standards; scope, purpose, and applicability
Section 312IAC25-6-140. Prime farmland; special performance standards; United States Soil Conservation Service criteria
Section 312IAC25-6-141. Prime farmland; special performance standards; soil removal and stockpiling
Section 312IAC25-6-142. Prime farmland; special performance standards; soil replacement
Section 312IAC25-6-143. Prime farmland; special performance standards; revegetation and restoration of soil productivity
Section 312IAC25-6-144. Steep slopes; backfilling and grading
Section 312IAC25-6-145. Coal preparation plants not within permit area for a mine; permits; applicability
Section 312IAC25-6-146. Coal preparation plants not within a permit area for a mine; special performance standards
Section 312IAC25-6-147. In situ processing; special performance standards
Section 312IAC25-6-148. In situ processing; monitoring
Section 312IAC25-6-149. Annual report