Indiana Administrative Code (Last Updated: December 20, 2016) |
Title 312. NATURAL RESOURCES COMMISSION |
Article 312IAC25. COAL MINING AND RECLAMATION OPERATIONS |
Rule 312IAC25-4. Permitting Procedures |
Section 312IAC25-4-55. Surface mining permit applications; reclamation and operations plan; transportation facilities
-
Each application shall contain a description of each road, conveyor, or rail system to be constructed, used, or maintained within the proposed permit area. The description shall include a map, appropriate cross sections, and the following:
(1) Specifications for each culvert, bridge, drainage ditch, and drainage structure.
(2) A description of measures to be taken to comply with 312 IAC 25-6-65.
(3) Each plan shall contain a general description of each road, conveyor, or rail system to be constructed, used, or maintained within the proposed permit area.
(Natural Resources Commission; 312 IAC 25-4-55; filed Jun 21, 2001, 2:53 p.m.: 24 IR 3459, eff Dec 1, 2001; readopted filed May 29, 2007, 9:51 a.m.: 20070613-IR-312070146RFA; readopted filed Sep 19, 2013, 10:12 a.m.: 20131016-IR-312130125RFA)