Rule 312IAC25-1. Definitions  


Section 312IAC25-1-1. Applicability
Section 312IAC25-1-2. "A horizon" defined
Section 312IAC25-1-3. "Acid-drainage" defined
Section 312IAC25-1-4. "Acid-forming materials" defined
Section 312IAC25-1-5. "Act" defined
Section 312IAC25-1-6. "Adjacent area" defined
Section 312IAC25-1-7. "Administratively complete application" defined
Section 312IAC25-1-8. "Affected area" defined
Section 312IAC25-1-9. "Agricultural use" defined
Section 312IAC25-1-10. "Applicant" defined
Section 312IAC25-1-10.5. "Applicant/violator system" defined
Section 312IAC25-1-11. "Application" defined
Section 312IAC25-1-12. "Approximate original contour" defined
Section 312IAC25-1-13. "Aquifer" defined
Section 312IAC25-1-14. "Auger mining" defined
Section 312IAC25-1-15. "Augmented seeding, fertilization, or irrigation" defined
Section 312IAC25-1-16. "B horizon" defined
Section 312IAC25-1-17. "Best technology currently available" defined
Section 312IAC25-1-18. "Box cut spoil" defined
Section 312IAC25-1-19. "C horizon" defined
Section 312IAC25-1-20. "Cemetery" defined
Section 312IAC25-1-21. "Certified blaster" defined
Section 312IAC25-1-22. "Coal" defined
Section 312IAC25-1-23. "Coal exploration" defined
Section 312IAC25-1-24. "Coal mine waste" defined
Section 312IAC25-1-25. "Coal preparation" defined
Section 312IAC25-1-26. "Coal preparation plant" defined
Section 312IAC25-1-27. "Coal processing waste" defined
Section 312IAC25-1-28. "Combustible material" defined
Section 312IAC25-1-29. "Commission" defined
Section 312IAC25-1-30. "Community or institutional building" defined
Section 312IAC25-1-31. "Compaction" defined
Section 312IAC25-1-32. "Complete application" defined
Section 312IAC25-1-32.5. "Control or controller" defined
Section 312IAC25-1-33. "Cropland" defined
Section 312IAC25-1-34. "Cumulative impact area" defined
Section 312IAC25-1-35. "Cumulative measurement period" defined
Section 312IAC25-1-36. "Cumulative production" defined
Section 312IAC25-1-37. "Cumulative revenue" defined
Section 312IAC25-1-38. "Department" defined
Section 312IAC25-1-39. "Developed water resources" defined
Section 312IAC25-1-40. "Director" defined
Section 312IAC25-1-41. "Disturbed area" defined
Section 312IAC25-1-42. "Diverse vegetation" defined
Section 312IAC25-1-43. "Diversion" defined
Section 312IAC25-1-44. "Downslope" defined
Section 312IAC25-1-45. "Drinking, domestic, or residential water supply" defined
Section 312IAC25-1-45.5. "Drinking water well" defined
Section 312IAC25-1-46. "Embankment" defined
Section 312IAC25-1-47. "Ephemeral stream" defined
Section 312IAC25-1-48. "Excess spoil" defined
Section 312IAC25-1-49. "Existing structure" defined
Section 312IAC25-1-50. "Extraction of coal as an incidental part" defined
Section 312IAC25-1-51. "Federal land" defined
Section 312IAC25-1-51.5. "Federal Office of Surface Mining Applicant/Violator System Office" defined
Section 312IAC25-1-52. "Fish and wildlife habitat" defined
Section 312IAC25-1-53. "Forestry" defined
Section 312IAC25-1-54. "Fragile lands" defined
Section 312IAC25-1-55. "Fugitive dust" defined
Section 312IAC25-1-56. "General area" defined
Section 312IAC25-1-57. "Government-financed construction" defined
Section 312IAC25-1-58. "Government financing agency" defined
Section 312IAC25-1-59. "Ground cover" defined
Section 312IAC25-1-60. "Ground water" defined
Section 312IAC25-1-60.5. "Ground water management zone" defined
Section 312IAC25-1-61. "Half-shrub" defined
Section 312IAC25-1-62. "Head-of-hollow fill" defined
Section 312IAC25-1-63. "High level management" defined
Section 312IAC25-1-64. "Highwall" defined
Section 312IAC25-1-65. "Historic lands" defined
Section 312IAC25-1-66. "Historically used for cropland" defined
Section 312IAC25-1-67. "Hydrologic balance" defined
Section 312IAC25-1-68. "Hydrologic regime" defined
Section 312IAC25-1-69. "Imminent danger to the health and safety of the public" defined
Section 312IAC25-1-70. "Impounding structure" defined
Section 312IAC25-1-71. "Impoundment" defined
Section 312IAC25-1-72. "In situ process" defined
Section 312IAC25-1-73. "Industrial/commercial" defined
Section 312IAC25-1-74. "Intermittent stream" defined
Section 312IAC25-1-75. "Irreparable damage to the environment" defined
Section 312IAC25-1-75.1. "Knowing or knowingly" defined
Section 312IAC25-1-75.5. "Land eligible for remining" defined
Section 312IAC25-1-76. "Land occasionally cut for hay" defined
Section 312IAC25-1-77. "Land use" defined
Section 312IAC25-1-78. "Litter" defined
Section 312IAC25-1-79. "Material damage" defined
Section 312IAC25-1-80. "Mining area" defined
Section 312IAC25-1-81. "MSHA" defined
Section 312IAC25-1-82. "Mulch" defined
Section 312IAC25-1-83. "Native species" defined
Section 312IAC25-1-84. "Natural hazard lands" defined
Section 312IAC25-1-85. "Noncommercial building" defined
Section 312IAC25-1-86. "Noxious weeds" defined
Section 312IAC25-1-87. "Occupied dwelling" defined
Section 312IAC25-1-88. "Occupied residential dwelling and structures related thereto" defined
Section 312IAC25-1-89. "Operator" defined
Section 312IAC25-1-90. "Other minerals" defined
Section 312IAC25-1-91. "Other treatment facilities" defined
Section 312IAC25-1-92. "Outslope" defined
Section 312IAC25-1-93. "Overburden" defined
Section 312IAC25-1-94. "Owned or controlled" and "owns or controls" defined
Section 312IAC25-1-95. "Pastureland" defined
Section 312IAC25-1-96. "Perennial stream" defined
Section 312IAC25-1-97. "Performance bond" defined
Section 312IAC25-1-98. "Permanent diversion" defined
Section 312IAC25-1-99. "Permanent impoundment" defined
Section 312IAC25-1-100. "Permit" defined
Section 312IAC25-1-101. "Permit area" defined
Section 312IAC25-1-102. "Permittee" defined
Section 312IAC25-1-103. "Person" defined
Section 312IAC25-1-104. "Person having an interest, which is or may be adversely affected or person with a valid legal interest" defined
Section 312IAC25-1-105. "Pipeline" defined
Section 312IAC25-1-106. "Precipitation event" defined
Section 312IAC25-1-107. "Previously mined area" defined
Section 312IAC25-1-108. "Prime farmland" defined
Section 312IAC25-1-109. "Principal shareholder" defined
Section 312IAC25-1-109.5. "Property boundary" defined
Section 312IAC25-1-110. "Property to be mined" defined
Section 312IAC25-1-111. "Public building" defined
Section 312IAC25-1-112. "Public office" defined
Section 312IAC25-1-113. "Public park" defined
Section 312IAC25-1-114. "Public road" defined
Section 312IAC25-1-115. "Randomly located" defined
Section 312IAC25-1-116. "Recharge capacity" defined
Section 312IAC25-1-117. "Reclamation" defined
Section 312IAC25-1-118. "Recreation" defined
Section 312IAC25-1-119. "Recurrence interval" defined
Section 312IAC25-1-120. "Reference area" defined
Section 312IAC25-1-121. "Refuse pile" defined
Section 312IAC25-1-122. "Regional director" defined
Section 312IAC25-1-123. "Renewable resource lands" defined
Section 312IAC25-1-124. "Replacement of water supply" defined
Section 312IAC25-1-125. "Residential" defined
Section 312IAC25-1-126. "Road" defined
Section 312IAC25-1-127. "Rooting media" defined
Section 312IAC25-1-128. "Safety factor" defined
Section 312IAC25-1-129. "Shadow area" defined
Section 312IAC25-1-130. "Shelter belt" defined
Section 312IAC25-1-131. "Significant, imminent environmental harm to land, air, or water resources" construed
Section 312IAC25-1-132. "Siltation structure" defined
Section 312IAC25-1-133. "Slope" defined
Section 312IAC25-1-134. "Soil horizon" defined
Section 312IAC25-1-135. "Soil productivity" defined
Section 312IAC25-1-136. "Soil survey" defined
Section 312IAC25-1-137. "Spoil" defined
Section 312IAC25-1-138. "Stabilize" defined
Section 312IAC25-1-139. "Steep slope" defined
Section 312IAC25-1-140. "Subsoil" defined
Section 312IAC25-1-141. "Substantial legal and financial commitments in a surface coal mining operation" defined
Section 312IAC25-1-142. "Substantially disturb" defined
Section 312IAC25-1-143. "Support facility" defined
Section 312IAC25-1-144. "Surface coal mining and reclamation operations" defined
Section 312IAC25-1-145. "Surface coal mining operation" defined
Section 312IAC25-1-146. "Surface coal mining operations that exist on the date of enactment" defined
Section 312IAC25-1-147. "Surface mining activities" defined
Section 312IAC25-1-148. "Surface soil" defined
Section 312IAC25-1-149. "Suspended solids or nonfilterable residue expressed as milligrams per liter" defined
Section 312IAC25-1-150. "Temporary diversion" defined
Section 312IAC25-1-151. "Temporary impoundment" defined
Section 312IAC25-1-152. "Ton" defined
Section 312IAC25-1-153. "Topsoil" defined
Section 312IAC25-1-154. "Toxic-forming materials" defined
Section 312IAC25-1-155. "Toxic mine drainage" defined
Section 312IAC25-1-155.5. "Unanticipated event or condition" defined
Section 312IAC25-1-156. "Underground development waste" defined
Section 312IAC25-1-157. "Underground mining activities" defined
Section 312IAC25-1-158. "Undeveloped land–no current use or land management" defined
Section 312IAC25-1-159. "Valid existing rights" defined and construed
Section 312IAC25-1-160. "Valley fill" defined
Section 312IAC25-1-161. "Violation notice" defined
Section 312IAC25-1-162. "Water table" defined
Section 312IAC25-1-163. "Willful violation" defined