Section 312IAC16-3-1. Permit required  


Latest version.
  •    (a) A person may not drill, deepen, operate, or convert a well for oil and gas purposes without a permit issued by the division under IC 14-37 and this rule.

      (b) No person may commence drilling, construction, operation, or conversion of a Class II well except in conformance with this rule.

      (c) The original or a copy of the permit must be posted by the operator at the well site before drilling, deepening, or operating a well. (Natural Resources Commission; 312 IAC 16-3-1; filed Feb 23, 1998, 11:30 a.m.: 21 IR 2331; readopted filed Nov 17, 2004, 11:00 a.m.: 28 IR 1315; readopted filed Mar 25, 2010, 2:57 p.m.: 20100421-IR-312100033RFA; readopted filed Sep 30, 2015, 12:13 p.m.: 20151028-IR-312150224RFA)