Indiana Administrative Code (Last Updated: December 20, 2016) |
Title 312. NATURAL RESOURCES COMMISSION |
Article 312IAC16. OIL AND GAS |
Rule 312IAC16-3. Permits |
Section 312IAC16-3-1. Permit required
Latest version.
-
(a) A person may not drill, deepen, operate, or convert a well for oil and gas purposes without a permit issued by the division under IC 14-37 and this rule.
(b) No person may commence drilling, construction, operation, or conversion of a Class II well except in conformance with this rule.
(c) The original or a copy of the permit must be posted by the operator at the well site before drilling, deepening, or operating a well. (Natural Resources Commission; 312 IAC 16-3-1; filed Feb 23, 1998, 11:30 a.m.: 21 IR 2331; readopted filed Nov 17, 2004, 11:00 a.m.: 28 IR 1315; readopted filed Mar 25, 2010, 2:57 p.m.: 20100421-IR-312100033RFA; readopted filed Sep 30, 2015, 12:13 p.m.: 20151028-IR-312150224RFA)