Section 170IAC4-3-4. General coordination  


Latest version.
  •    General Co-ordination. All supply and signal systems should be so located, constructed, operated and maintained as to meet the reasonable service requirements of the public and in conformity with general co-ordinated methods as far as specified in these rules. These methods should facilitate the safety and serviceability of all systems. Reasonable foresight should be exercised in new construction and reconstruction, to facilitate co-ordination between supply and signal systems and between supply or signal lines and the tracks of steam and electric railroads at crossings. (Indiana Utility Regulatory Commission; No. 17689: Safety And Inductive Co-ordination Rule 4; filed Jan 2, 1946, 10:00 am: Rules and Regs. 1947, p. 1633; readopted filed Jul 11, 2001, 4:30 p.m.: 24 IR 4233; readopted filed Apr 24, 2007, 8:21 a.m.: 20070509-IR-170070147RFA; readopted filed Aug 2, 2013, 2:16 p.m.: 20130828-IR-170130227RFA)