Indiana Administrative Code (Last Updated: December 20, 2016) |
Title 170. INDIANA UTILITY REGULATORY COMMISSION |
Article 170IAC6. WATER UTILITIES |
Rule 170IAC6-3. Central Station Hot Water Heating Utilities |
Section 170IAC6-3-19. Customer request for test; application to Indiana utility regulatory commission
-
Test or Inspection upon Application to the Commission. Upon formal application of any consumer to the commission, an inspection and if necessary, a test will be made upon the consumer's heating system, such inspection or test to be made as soon as is practicable after the receipt of the application. If the commission finds that the utility is at fault and has rendered inadequate service, the expense of the investigation or test shall be borne by the utility and the cause of inadequate service be remedied within a period of time as determined by the commission. If the commission finds that the consumer is at fault, the expense of the investigation or test shall be borne by the consumer and the cause for inadequate service be remedied within a period of time as determined by the commission. In case a test is required a cash deposit of five dollars shall be made with the commission by the petitioner previous to the making of the test. (Indiana Utility Regulatory Commission; No. 17689: Standards of Service For Central Station Hot Water Heating Utilities ; filed Jan 2, 1946, 10:00 am: Rules and Regs. 1947, p. 1664; readopted filed Jul 11, 2001, 4:30 p.m.: 24 IR 4233; readopted filed Apr 24, 2007, 8:21 a.m.: 20070509-IR-170070147RFA; errata filed Jul 21, 2009, 1:33 p.m.: 20090819-IR-170090571ACA; readopted filed Aug 2, 2013, 2:16 p.m.: 20130828-IR-170130227RFA)