Section 130IAC4-2-2. Construction on commission land  


Latest version.
  •    No construction shall commence within any port or upon any port area without the prior written consent from the executive director, the port engineer, or the port director. Any authorized construction shall be limited to the area specifically approved in writing by the executive director, the port engineer, or the port director. (Ports of Indiana; 130 IAC 4-2-2; filed Jun 6, 2002, 11:22 a.m.: 25 IR 3712; readopted filed Nov 7, 2008, 1:50 p.m.: 20081203-IR-130080612RFA; readopted filed Oct 24, 2014, 11:28 a.m.: 20141119-IR-130140345RFA)